Risk response incorporating risk preferences in international construction projects

被引:13
|
作者
Yan, Peng [1 ]
Liu, Junying [2 ]
Zhao, Xianbo [3 ]
Skitmore, Martin [4 ]
机构
[1] Tianjin Chengjian Univ, Sch Econ & Management, Tianjin, Peoples R China
[2] Tianjin Univ, Coll Management & Econ, Dept Construct Management, Tianjin, Peoples R China
[3] Cent Queensland Univ, Sch Engn & Technol, Sydney, NSW, Australia
[4] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld, Australia
关键词
International construction projects; Risk response strategies; Risk preference; Fuzzy chance constrained programming; Credibility theory; DECISION-MAKING; STRATEGIES; MANAGEMENT; MODEL; SELECTION; PERSPECTIVE; ATTITUDES; AVERSION; DRIVERS; DESIGN;
D O I
10.1108/ECAM-03-2019-0132
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The objective of this research is to develop a decision method that can generate appropriate risk response strategies for international construction project managers (PMs) and allow these strategies to reflect their different risk preferences. Design/methodology/approach The optimal model approach is adopted. A credibility-based fuzzy chance constrained programming (CFCCP) model is developed, which simultaneously minimizes the expected losses of risk events and total costs of risk response. To solve this multi-objective model, a fuzzy interactive solution method is used. Moreover, the model performance is demonstrated by a real international industrial plant project. In addition, a sensitivity analysis of the model is conducted. Findings The result of the sensitivity analysis indicates that PMs with a greater risk aversion can lead to a higher mitigation ratio of expected losses of risk events and a higher total cost of risk response. Practical implications This research provides contractors with an effective decision-making model to develop a project risk response plan, and it will assist contractors to minimize risk losses and enhance the project performance in the international construction market. Originality/value Previous studies overlook the risk preference, which is an important behavioral factor influencing decisions in risk response strategy selection. This research proposed a novel risk response strategy selection decision method that considers different attitudes toward risk among decision makers.
引用
收藏
页码:3499 / 3519
页数:21
相关论文
共 50 条
  • [31] Risk assessment in construction projects of Iraq
    Alklkali, Ali Moosa Taqi
    [J]. JOURNAL OF ALGEBRAIC STATISTICS, 2022, 13 (01) : 517 - 525
  • [32] Risk management for overseas construction projects
    Zhi, He
    [J]. International Journal of Project Management, 1995, 13 (04):
  • [33] Dynamic risk analysis in construction projects
    Nasirzadeh, Farnad
    Afshar, Abbas
    Khanzadi, Mostafa
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2008, 35 (08) : 820 - 831
  • [34] Risk Misallocation on Highway Construction Projects
    Hanna, Awad S.
    Blasier, Kelly
    Aoun, Diane G.
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2015, 7 (04)
  • [35] Risk Management Methods in Construction Projects
    Rehacek, Petr
    Bazsova, Blanka
    [J]. VISION 2020: SUSTAINABLE ECONOMIC DEVELOPMENT, INNOVATION MANAGEMENT, AND GLOBAL GROWTH, VOLS I-IX, 2017, 2017, : 3060 - 3069
  • [36] Financial risk management in the construction projects
    Shibani A.
    Hasan D.
    Saaifan J.
    Sabboubeh H.
    Eltaip M.
    Saidani M.
    Gherbal N.
    [J]. Journal of King Saud University - Engineering Sciences, 2024, 36 (08) : 552 - 561
  • [37] The allocation of risk in PPP construction projects
    Cao, Yubo
    Zhang, Lianying
    [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2008, : 285 - 292
  • [38] A risk management model for construction projects
    Smit, S
    Al-Jibouri, S
    van den Adel, J
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2233 - 2238
  • [39] RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS
    PERRY, JG
    HAYES, RW
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1985, 78 (JUN): : 499 - 521
  • [40] Evaluation of risk level for construction projects
    Son, K. S.
    Yang, H. S.
    [J]. SAFETY AND RELIABILITY FOR MANAGING RISK, VOLS 1-3, 2006, : 2119 - +