The height of fractured water-conducting zone in undermined rock strata

被引:189
|
作者
Miao, Xiexing [2 ]
Cui, Ximin [1 ]
Wang, Jin'an [3 ]
Xu, Jialin [2 ]
机构
[1] China Univ Min & Technol Beijing, Inst Geosci & Surveying Engn, State Key Lab Coal Resource & Safety Min, Beijing 100083, Peoples R China
[2] China Univ Min & Technol, State Key Lab Geomech & Deep Underground Engn, Xuzhou 221008, Jiangsu, Peoples R China
[3] Univ Sci & Technol Beijing, Beijing 100083, Peoples R China
基金
中国国家自然科学基金;
关键词
Fractured water conducting zone; Overburden movement; Site observation; Empirical formula; Key strata; Similar material model;
D O I
10.1016/j.enggeo.2011.03.009
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The height of fractured water conducting zone is of significant importance for the safety of underground mining. Because of the conspicuous discrepancy of the height of fractured water conducting zone in Bulianta Coal Mine as predicted by the traditional method with those observed in practice, a systematic research has been carried out. The study indicates that two aspects should be taken into account. Firstly, the traditionally proposed empirical formula in prediction of the height of fractured zone was based on the conditions of single-slice mining where the mining height was less than 3 m and the total slice mining height was limited within 15 m. In such a case, it would not be suitable to predict the maximum fractured zone height for the conditions where a single mining height is larger than 3 m. Secondly, the stratum structure such as the thick and strong rock layer termed as key stratum plays an important role in controlling of the height of movement in the overburden. Physical model tests by making use of a similar material illustrate that if the vertical distance from the primary key stratum to the coal seam is shorter than a certain value, then the developing fracture zone will extend above the key stratum into the top of bedrock, resulting in a larger height of water conducting zone than is calculated by the empirical method. The outcome of the work presented will be helpful in practice to prevent the overburden aquifer inrush and to avoid mine water hazard. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:32 / 39
页数:8
相关论文
共 50 条
  • [31] Adaptive filtering of microseismic data for monitoring a water-conducting fractured zone in a mine
    Li, Hongjiang
    Han, Liang
    Dong, Donglin
    SCIENTIFIC REPORTS, 2022, 12 (01)
  • [32] Adaptive filtering of microseismic data for monitoring a water-conducting fractured zone in a mine
    Hongjiang Li
    Liang Han
    Donglin Dong
    Scientific Reports, 12
  • [33] A New Method of Predicting the Height of the Fractured Water-Conducting Zone Due to High-Intensity Longwall Coal Mining in China
    Wenbing Guo
    Gaobo Zhao
    Gaozhong Lou
    Shuren Wang
    Rock Mechanics and Rock Engineering, 2019, 52 : 2789 - 2802
  • [34] A prediction model for the height of the water-conducting fractured zone in the roof of coal mines based on factor analysis and RBF neural network
    Yaoshan Bi
    Jiwen Wu
    Xiaorong Zhai
    Kai Huang
    Arabian Journal of Geosciences, 2022, 15 (3)
  • [35] Prediction of the Height of Fractured Water-Conducting Zone Based on the Improved Cuckoo Search Algorithm-Extreme Learning Machine Model
    Zhu, Zhijie
    Guan, Songsong
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [36] Research on prediction of the height of water-conducting fracture zone in Huanglong Jurassic Coalfield
    Wu J.
    Pan J.
    Gao J.
    Yan Y.
    Ma H.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2023, 51 : 231 - 241
  • [37] A New Method of Predicting the Height of the Fractured Water-Conducting Zone Due to High-Intensity Longwall Coal Mining in China
    Guo, Wenbing
    Zhao, Gaobo
    Lou, Gaozhong
    Wang, Shuren
    ROCK MECHANICS AND ROCK ENGINEERING, 2019, 52 (08) : 2789 - 2802
  • [38] Predicting the Height of the Water-conducting Fractured Zone Based on a Multiple Regression Model and Information Entropy in the Northern Ordos Basin, China
    Yang, Peng
    Yang, Weifeng
    Nie, Yuxu
    Saleem, Fahad
    Lu, Fei
    Ma, Rongkun
    Li, Ruipeng
    MINE WATER AND THE ENVIRONMENT, 2022, 41 (01) : 225 - 236
  • [39] Research on the Height of the Water-Conducting Fracture Zone in Fully Mechanized Top Coal Caving Face under Combined-Strata Structure
    Jiang, Donghai
    Tang, Yinfeng
    Huang, Wanpeng
    Hou, Keke
    Luo, Yi
    Liu, Jiangwei
    SUSTAINABILITY, 2022, 14 (21)
  • [40] Prediction of the Height of the Water-Conducting Zone Above the Mined Panel in Solid Backfill Mining
    Zhang, Jixiong
    Jiang, Haiqiang
    Deng, Xuejie
    Ju, Feng
    MINE WATER AND THE ENVIRONMENT, 2014, 33 (04) : 317 - 326