CAUSES OF VARIATION ORDERS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP

被引:44
|
作者
Enshassi, Adnan [1 ]
Arain, Faisal [1 ]
Al-Raee, Sadi [1 ]
机构
[1] Minist Transport, Gaza, Israel
关键词
variation orders; construction; contractors; consultant; owner;
D O I
10.3846/jcem.2010.60
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The maximum project performance would be achieved if the work invariably flows smoothly within time limits and anticipated budget. Variation orders result in time delay, cost overrun, quality defects, and other negative impacts. This is common in construction projects in Gaza Strip. The main objective of this study was to analyze the causes of variation orders in construction projects in Gaza Strip. The causes of variation orders in construction process in Gaza Strip were investigated through questionnaire survey of 36 classified construction companies, 25 consultants and 15 owners. 64 causes of variation orders were identified from literature review. The study results identified the top ten most important factors that include lack of materials and equipment spare parts due to closure, change in design by consultant, lack of consultant's knowledge of available materials, errors and omission in design, conflicts between contract documents, owner's financial problems, lack of coordination among project parties, using inadequate specification for local markets by international consultant, internal politics, and change is specification by owners. In general, the study shows an agreement among owners, consultants and contractors regarding the ranking of the 64 factors causing variation orders. The results also reveal that factors related to consultant are the most important causes of variation orders followed by the factors related to owner. An understanding of the causes of variation orders would be helpful for building professionals in assessing variation orders. Furthermore, the study would also assist professionals in taking proactive measures for reducing variation orders in construction projects. The findings from this study would also be valuable for all construction professionals in general.
引用
收藏
页码:540 / 551
页数:12
相关论文
共 50 条
  • [1] Causes of Variation Orders in Construction of Hydropower Projects of Pakistan
    Hanif, Hashim
    Khurshid, Muhammad Bilal
    Malik, Sohail
    Nauman, Shazia
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MANAGEMENT AND ENGINEERING (CME 2014), 2014, : 1268 - 1274
  • [2] ANALYSIS OF CONTRACTORS PERFORMANCE IN GAZA STRIP CONSTRUCTION PROJECTS
    Enshassi, Adnan
    Abdul-Aziz, Abdul-Rashid
    Abushaban, Saleh
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2012, 12 (02) : 65 - 79
  • [3] Delays and cost overruns in the construction projects in the Gaza Strip
    Enshassi, Adnan
    Al-Najjar, Jomah
    Kumaraswamy, Mohan
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2009, 14 (02) : 126 - +
  • [4] MUD BUILDING PRACTICES IN CONSTRUCTION PROJECTS IN THE GAZA STRIP
    El-Sawalhi, Nabil Ibrahim
    Abu Ajwa, Hamed E.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2013, 13 (02) : 13 - 26
  • [5] FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP
    Enshassi, Adnan
    Mohamed, Sherif
    Abushaban, Saleh
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2009, 15 (03) : 269 - 280
  • [6] Causes of Change Orders in Construction Projects
    Khalifa, Walid M. A.
    Mahamid, Ibrahim
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2019, 9 (06) : 4956 - 4961
  • [7] Towards lean and green thinking in construction projects at Gaza Strip
    El-Sawalhi, Nabil, I
    Taber, Bilal Majid
    Al Shukri, Abed
    [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2018, 10 (01): : 1827 - 1838
  • [8] Factors affecting stakeholder management in construction projects in the Gaza Strip
    El-Sawalhi, Nabil Ibrahim
    Hammad, Salah
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2015, 15 (02) : 157 - 169
  • [9] Energy Management Application in Construction Projects in the Gaza Strip, Palestine
    Enshassi, Adnan
    Ayash, Abed
    Mohamed, Sherif
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2019, 24 (01) : 1 - 21
  • [10] Risk Analysis and Waste Management for Construction and Demolition Projects in the Gaza Strip
    Hamad, Rami J. A.
    Hallaq, Khalid A. Al
    Tayeh, Bassam A.
    Nassar, Salwa S.
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2022, 16 (03) : 417 - 435