FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP

被引:176
|
作者
Enshassi, Adnan [1 ]
Mohamed, Sherif [2 ]
Abushaban, Saleh [3 ]
机构
[1] Islam Univ Gaza, Sch Civil Engn, Gaza, Israel
[2] Griffith Univ, Sch Engn, Gold Coast Campus, Qld 4222, Australia
[3] Community Coll Appl Sci & Technol, Continuing Educ Ctr, Gaza, Israel
关键词
performance; owners; consultants; contractors; projects; TIME PERFORMANCE; MODEL;
D O I
10.3846/1392-3730.2009.15.269-280
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects located in the Gaza Strip, Palestine suffer from many problems and complex issues. Consequently, the objective of this paper is to identify the factors affecting the performance of local construction projects; and to elicit perceptions of their relative importance. A comprehensive literature review was deployed to generate a set of factors believed to affect project performance. A total of 120 questionnaires were distributed to 3 key groups of project participants; namely owners, consultants and contractors. The survey findings indicate that all 3 groups agree that the most important factors affecting project performance are: delays because of borders/roads closure leading to materials shortage; unavailability of resources; low level of project leadership skills; escalation of material prices; unavailability of highly experienced and qualified personnel; and poor quality of available equipment and raw materials. Based on these findings, the paper recommends that: 1) project owners must work collaboratively with contractors and facilitate regular payments in order to overcome delays, disputes and claims; 2) project participants should actively have their input in the process of decision-making; and 3) continuous coordination and relationship between project participants are required through the project life cycle in order to solve problems and develop project performance.
引用
下载
收藏
页码:269 / 280
页数:12
相关论文
共 50 条
  • [1] Factors affecting stakeholder management in construction projects in the Gaza Strip
    El-Sawalhi, Nabil Ibrahim
    Hammad, Salah
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2015, 15 (02) : 157 - 169
  • [2] ANALYSIS OF CONTRACTORS PERFORMANCE IN GAZA STRIP CONSTRUCTION PROJECTS
    Enshassi, Adnan
    Abdul-Aziz, Abdul-Rashid
    Abushaban, Saleh
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2012, 12 (02) : 65 - 79
  • [3] Factors affecting labour productivity in building projects in the Gaza strip
    School of Civil Engineering, Islamic University of Gaza, P.O. Box 108, Gaza, Ps
    不详
    不详
    J. Civ. Eng. Manage., 2007, 4 (245-254):
  • [4] Factors affecting defects occurrence in the construction stage of residential buildings in Gaza Strip
    Bassam A. Tayeh
    Ahsen Maqsoom
    Yazan Issa Abu Aisheh
    Mansour Almanassra
    Hammad Salahuddin
    Muhammad Irshad Qureshi
    SN Applied Sciences, 2020, 2
  • [5] Factors affecting defects occurrence in the construction stage of residential buildings in Gaza Strip
    Tayeh, Bassam A.
    Maqsoom, Ahsen
    Abu Aisheh, Yazan Issa
    Almanassra, Mansour
    Salahuddin, Hammad
    Qureshi, Muhammad Irshad
    SN APPLIED SCIENCES, 2020, 2 (02):
  • [6] CAUSES OF VARIATION ORDERS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP
    Enshassi, Adnan
    Arain, Faisal
    Al-Raee, Sadi
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (04) : 540 - 551
  • [7] Delays and cost overruns in the construction projects in the Gaza Strip
    Enshassi, Adnan
    Al-Najjar, Jomah
    Kumaraswamy, Mohan
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2009, 14 (02) : 126 - +
  • [8] MUD BUILDING PRACTICES IN CONSTRUCTION PROJECTS IN THE GAZA STRIP
    El-Sawalhi, Nabil Ibrahim
    Abu Ajwa, Hamed E.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2013, 13 (02) : 13 - 26
  • [9] Factors Affecting the Performance of Construction Projects in Pakistan
    Iqbal, Muhammad
    Khan, Imtiaz
    Ahmad, Fawad
    Ahad, Muhammad Zeeshan
    Munir, Mehre
    JOURNAL OF MECHANICS OF CONTINUA AND MATHEMATICAL SCIENCES, 2019, 14 (03): : 336 - 358
  • [10] Towards lean and green thinking in construction projects at Gaza Strip
    El-Sawalhi, Nabil, I
    Taber, Bilal Majid
    Al Shukri, Abed
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2018, 10 (01): : 1827 - 1838