COST REDUCTION AND ENERGY SAVING BY IMPLEMENTING OPTIMAL REVAMPING FOR A BLAST FURNACE'S MOTOR BLOWER

被引:1
|
作者
Shim, Woosung [1 ]
Oh, Sanghyun [1 ]
机构
[1] Korea Inst Energy Res, Energy Dept POSCO Pohang Steel Works, Daejeon, South Korea
来源
关键词
integrated steel mill; motor blower; partial revamping; efficiency; energy saving;
D O I
10.2495/ESUS170471
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Following the launch of the new government, declaration of the de-nuclear, de-coal power plant changed Korea's energy strategy. The demand for renewable energy or energy saving technology is expected to increase significantly in the future. In the absence of clear alternatives to replace nuclear or large capacity coal fired power plants, we expect the industry's electricity charge will continue to rise. The integrated steel mill is the mass scaled equipment industry, POSCO and is now using up to 8% of Korea's energy consumption. Considering the government's recent policy and in order to enhance the profitability of the company, we are actively promoting activities such as increasing efficiency and reducing energy consumption. The core of the steel mill is the blast furnace, and the motor blower supplies large capacity, high pressurized air to the blast furnace. Using the large capacity motor as a power source, it accounts for 10% of the steel mill's electrical consumption. When the blower blade's failure, due to being used for such a long time, we implemented partial revamping that can minimize the cost and the construction period. As a result of successful revamping, we could contribute to minimize the payback period and improve the profitability of the steel mill.
引用
收藏
页码:513 / 518
页数:6
相关论文
共 50 条
  • [21] 30 MW BLAST-FURNACE BLOWER DRIVE WITH 2-POLE SYNCHRONOUS MOTOR AND STATIC STARTING CONVERTER
    ECKERT, J
    ROMASCAN, A
    SIEMENS ZEITSCHRIFT, 1978, 52 (09): : 504 - 509
  • [22] AUTOMATED PUMP AND BLOWER OPERATION FOR RELIABILITY, COST REDUCTION AND ENERGY-CONSERVATION
    DOBROWOLSKI, FJ
    MENDELSOHN, J
    PROGRESS IN WATER TECHNOLOGY, 1978, 9 (5-6): : 405 - 408
  • [23] Energy-saving coke-substitution technologies in blast-furnace smelting
    Shatlov V.A.
    Steel in Translation, 2007, 37 (07) : 598 - 599
  • [24] Energy-Saving and Emission-Reducing of Blast Furnace Ironmaking Production in China
    Yang Tian-jun
    Zhang Jian-liang
    Zuo Hai-bin
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2009, 16 : 587 - 592
  • [25] Optimal DO Setpoint Decision and Electric Cost Saving in Aerobic Reactor Using Respirometer and Air Blower Control
    Lee, Kwang Su
    Kim, Minhan
    Kim, Jongrack
    Yoo, Changkyoo
    KOREAN CHEMICAL ENGINEERING RESEARCH, 2014, 52 (05): : 581 - 586
  • [26] Design of optimal temperature patterns in the reheating furnace with regenerative burner for energy saving
    Jang, YJ
    Lee, YK
    Kim, SW
    Proceedings of the IASTED International Conference on Applied Simulation and Modelling, 2004, : 35 - 40
  • [27] ENERGY SAVING THROUGH OPTIMAL-CONTROL OF HOT BLAST STOVES BY MICROPROCESSORS
    REINITZHUBER, F
    GEESMANN, E
    POTH, G
    STAHL UND EISEN, 1984, 104 (12-1): : 617 - 623
  • [28] Optimal allocation of fuel and energy resources in the complex blast-furnace plants
    Spirin, N.
    Lavrov, V.
    Lazic, L.
    Gurin, I.
    Istomin, A.
    MANAGEMENT OF NATURAL RESOURCES, SUSTAINABLE DEVELOPMENT AND ECOLOGICAL HAZARDS IV, 2015, 199 : 157 - 165
  • [29] STATIC FREQUENCY-CONVERTER FOR STARTING A 30 MW BLAST-FURNACE BLOWER DRIVE WITH 2-POLE SYNCHRONOUS MOTOR
    BARDAHL, N
    ROMASCAN, A
    WEIGEL, WD
    SIEMENS ZEITSCHRIFT, 1978, 52 (09): : 509 - 512