Optimization on Stay Cable's Initial Tension Force for Extradosed Cable-Stayed Bridge

被引:0
|
作者
Lin, Peng-Zhen [1 ]
机构
[1] Lanzhou Jiaotong Univ, Key Lab Rd Bridge & Underground Engn Gansu Prov, Lanzhou 730070, Gansu, Peoples R China
关键词
extradosed cable-stayed bridge; optimization; initial tension force; gradient projection method;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Initial tension force of stay cables have large influence on mechanical performance for extradosed cable-stayed bridges (ECSB) at state of completed bridge. The paper defines relationship between structural members' internal force and initial tension force of stay cables based on influence matrix method. Setting the minimum potential energy of whole structure as objective function, the optimal model of quadratic linear programming for initial tension force of stay cables is presented. Embedded the optimal model in general finite element program, optimal soft for initial tension force of ECSB stay cables is programmed and named CBOP. Using the optimal program to a two spans ECSB, the maximum positive and negative moment of girder are decreased 14% and 49% respectively while total initial tension force only increased 8%, meanwhile the girder's moment distribution is more homogeneous along girder. The optimal method and program is useful and effective to determine and adjust of initial tension force of stay cables for ECSB.
引用
收藏
页码:302 / 305
页数:4
相关论文
共 50 条
  • [1] Study on Cable Force Optimization for Extradosed Cable-stayed Bridge under the Rational Completion Stage
    Wang, Xiaolei
    Liang, Tian
    Qi, Tiedong
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1170 - +
  • [2] Optimization of Cable Force Adjustment in Cable-Stayed Bridge considering the Number of Stay Cable Adjustment
    Zhang, Han-Hao
    Sun, Nan-Nan
    Wang, Pei-Zhi
    Liu, Man-Hui
    Li, Yuan
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [3] Determination of cable tension on cable-stayed bridge
    Yao, Wen-Bin
    Zhang, Wei
    Shao, Qian-Jun
    Chinese Journal of Sensors and Actuators, 2004, 17 (03) : 484 - 487
  • [4] Optimization for cable-force of extradosed cable-stayed bridges based on minimal cost principle
    Chen, Cong-Chun
    Gongcheng Lixue/Engineering Mechanics, 2012, 29 (05): : 141 - 146
  • [5] Review on Cable Force Optimization Method for Cable-stayed Bridge in Completed Bridge State
    Dai J.
    Qin F.-J.
    Di J.
    Chen Y.-R.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2019, 32 (05): : 17 - 37
  • [7] Monitoring calculation of closure change of Extradosed Cable-stayed Bridge
    Shi, Jing Xian
    Ran, Zhi Hong
    2018 4TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING (ICEMEE 2018), 2018, 38
  • [8] Assessment of cable tension condition based on optimum cable tension of cable-stayed bridge
    Institute of Architecture and Civil Engineering, Zhejiang University, Hangzhou 310027, China
    不详
    Zhejiang Daxue Xuebao (Gongxue Ban), 2006, 10 (1773-1777+1810):
  • [9] Critical threshold value for monitoring & management of cable tension force in cable-stayed bridge
    Cho, HN
    Choi, YM
    Lee, SC
    Kang, KK
    Choi, MY
    ADVANCES IN NONDESTRUCTIVE EVALUATION, PT 1-3, 2004, 270-273 : 1977 - 1982
  • [10] Influence of Cable Tension on the Mechanical Properties of Cable-stayed Bridge
    Li Xiaozhong
    Chen Xingchong
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2019, 13 (01) : 158 - 169