共 50 条
- [1] Study on Cable Force Optimization for Extradosed Cable-stayed Bridge under the Rational Completion Stage ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1170 - +
- [4] Optimization for cable-force of extradosed cable-stayed bridges based on minimal cost principle Gongcheng Lixue/Engineering Mechanics, 2012, 29 (05): : 141 - 146
- [5] Review on Cable Force Optimization Method for Cable-stayed Bridge in Completed Bridge State Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2019, 32 (05): : 17 - 37
- [6] Optimization of stay cable tension of completed bridge of single-pylon cable-stayed bridge based on particle swarm optimization algorithm 1600, Wuhan Bridge Research Institute (46):
- [7] Monitoring calculation of closure change of Extradosed Cable-stayed Bridge 2018 4TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING (ICEMEE 2018), 2018, 38
- [8] Assessment of cable tension condition based on optimum cable tension of cable-stayed bridge Zhejiang Daxue Xuebao (Gongxue Ban), 2006, 10 (1773-1777+1810):
- [9] Critical threshold value for monitoring & management of cable tension force in cable-stayed bridge ADVANCES IN NONDESTRUCTIVE EVALUATION, PT 1-3, 2004, 270-273 : 1977 - 1982