Importance-Performance Analysis Based on Choquet Integral with Respect to L-Measure

被引:0
|
作者
Lee, Shu-Juan [1 ]
Liu, Hsiang-Chuan [2 ]
Chen, Shih-Ming [1 ]
Jheng, Yu-Du [3 ]
机构
[1] Natl Taichung Univ, Grad Inst Educ Measurement & Stat, Taichung 40306, Taiwan
[2] Univ Asia, Dept Bioinformat & Med Informat, Taichung 41354, Taiwan
[3] Natl Taichung Univ, Dept Educ, Taichung 40306, Taiwan
来源
FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4 | 2011年 / 44-47卷
关键词
Web-based Multi-Survey; Importance-Performance Analysis; L-measure;
D O I
10.4028/www.scientific.net/AMM.44-47.3844
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, the Web-based Multi-Survey System was adopted, one or two choices available among five options, to set up questionnaire to get a nine-point scale with network programs. As an empirical research, which was conformed to the policy of Ministry of Education to promote technology abilities for teachers in Taichung County in 2009, the important and satisfied survey from Teachers' Free Software Application workshops was analyzed by four approaches which were Importance-Performance Analysis, Simple Logistic regression model, Choquet integral regression model with respect to A-measure, and Choquet integral regression model with respect to L-measure. By comparing MSE, Choquet integral regression model with L-measure obtained the best performance. Two crosshairs which were Hollenhorst's overall mean and Choquet integral regression model with L-measure were positioned for I-P matrix. From results, the L-measure model had shown better sensitivity about quadrant distribution, and reflected participants' real responses. At the same time, it was definitely known what to keep up the good work, concentrate here, or possible overkill through assessing Importance and Performance of teacher's workshops.
引用
收藏
页码:3844 / +
页数:2
相关论文
共 50 条
  • [31] Extensionally Completed L-measure Based on any Given Fuzzy Measure
    Liu, Hsiang-Chuan
    2009 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION, VOL 2, PROCEEDINGS, 2009, : 602 - 605
  • [32] A nonlinear regression model based on Choquet integral with ε-measure
    Liu, H. -C.
    Lin, W. C.
    Chang, K. Y.
    Weng, W. -S.
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 2020 - +
  • [33] A consideration of normality in importance-performance analysis
    Lai, Ivan Ka Wai
    Hitchcock, Michael
    CURRENT ISSUES IN TOURISM, 2015, 18 (10) : 979 - 1000
  • [34] Importance-Performance Analysis of Oleotourism Experience
    Ferreira, Jessica
    Silverio, Ana Cristina
    Scalabrini, Elaine
    Fernandes, Paula Odete
    ADVANCES IN TOURISM, TECHNOLOGY AND SYSTEMS, VOL 2, ICOTTS 2023, 2024, 384 : 129 - 141
  • [35] A critical evaluation of importance-performance analysis
    Azzopardi, Ernest
    Nash, Robert
    TOURISM MANAGEMENT, 2013, 35 : 222 - 233
  • [36] A comparison of approaches to importance-performance analysis
    Bacon, DR
    INTERNATIONAL JOURNAL OF MARKET RESEARCH, 2003, 45 (01) : 55 - 71
  • [37] A framework of importance-performance analysis based on the multiple determination coefficient
    Shieh, Jiunn-I.
    Wu, Hsin-Hung
    IAENG International Journal of Computer Science, 2020, 47 (03) : 463 - 467
  • [38] Symmetric coherent upper conditional prevision defined by the Choquet integral with respect to Hausdorff outer measure
    Doria, Serena
    ANNALS OF OPERATIONS RESEARCH, 2015, 229 (01) : 377 - 396
  • [39] Symmetric coherent upper conditional prevision defined by the Choquet integral with respect to Hausdorff outer measure
    Serena Doria
    Annals of Operations Research, 2015, 229 : 377 - 396
  • [40] Quantifying uncertainty in applying importance-performance analysis
    Wu, Hsin-Hung
    Shieh, Jiunn-I
    QUALITY & QUANTITY, 2010, 44 (05) : 997 - 1003