A simulation based approach to analyse the effects of job release on the performance of a multi-stage job-shop with processing flexibility

被引:13
|
作者
Baykasoglu, Adil [1 ,2 ]
Gocken, Mustafa [1 ,2 ]
机构
[1] Gaziantep Univ, Dept Ind Engn, Gaziantep, Turkey
[2] Gaziantep Univ, Dept Ind Engn, Gaziantep, Turkey
关键词
production planning and control; workload control; simulation; job release; DUE-DATE ASSIGNMENT; ORDER ACCEPTANCE; WORKLOAD CONTROL; AGGREGATE; STRATEGIES; RULES; TIMES;
D O I
10.1080/00207540903479778
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Workload control concepts are advocated as one of the new production planning and control methods. In its elaborated form, workload control includes three major decision levels: job entry, job release and priority dispatching. In each decision level, several decision points which have significant impact on the effectiveness of the production planning and control are defined (i.e., acceptance/rejection, due date assignment, etc.). Workload control systems should consider all of these decision points simultaneously in order to improve the effectiveness of production planning and control. In addition to these decision levels, flexibility of the shop can also be included as the fourth decision level which allows the shop capacity to be adjusted as new orders enter the system and as they are released to the shop floor. In this study, simulation models which enable the effect of each decision level within a workload control concept to be explored are developed and tested. The results reveal that simultaneous consideration of decision levels is critical and can improve the effectiveness of production planning and control.
引用
收藏
页码:585 / 610
页数:26
相关论文
共 50 条
  • [41] Studies on the Job-shop Scheduling Problem Based on Plant Growth Simulation Algorithm
    DING Xue-feng MA Liang YOU Jian-xin DING Xue-song(Tongji University School of Economics and Management
    [J]. 微计算机信息, 2010, 26 (30) : 4 - 7
  • [42] A Multi-swarm Approach to Multi-objective Flexible Job-shop Scheduling Problems
    Liu, Hongbo
    Abraham, Ajith
    Wang, Zuwen
    [J]. FUNDAMENTA INFORMATICAE, 2009, 95 (04) : 465 - 489
  • [43] OPAL - A MULTI-KNOWLEDGE-BASED SYSTEM FOR INDUSTRIAL JOB-SHOP SCHEDULING
    BENSANA, E
    BEL, G
    DUBOIS, D
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (05) : 795 - 819
  • [44] Multi-objective flexible job-shop scheduling based on learning effect
    Cao L.
    Ye C.
    Huang X.
    [J]. 2023, CIMS (24): : 2023 - 2034
  • [45] A Job-shop Scheduling Method Based on Multi-Agent Immune Algorithm
    Xu Xinli
    Hao Ping
    Wang Wanliang
    [J]. CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2527 - +
  • [46] A novel particle swarm optimization-based approach for job-shop scheduling
    Ge, H. W.
    Lu, Y. H.
    Zhou, Y.
    Guo, X. C.
    Liang, Y. C.
    [J]. COMPUTATIONAL METHODS, PTS 1 AND 2, 2006, : 1093 - +
  • [47] On the open job-shop scheduling problem: a decentralized multi-agent approach for the manufacturing system performance optimization
    Guizzi, Guido
    Revetria, Roberto
    Vanacore, Gianluigi
    Vespoli, Silvestro
    [J]. 12TH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING, 2019, 79 : 192 - 197
  • [48] A neutrosophic set-based TLBO algorithm for the flexible job-shop scheduling problem with routing flexibility and uncertain processing times
    Jin, Liangliang
    Zhang, Chaoyong
    Wen, Xiaoyu
    Sun, Chengda
    Fei, Xinjiang
    [J]. COMPLEX & INTELLIGENT SYSTEMS, 2021, 7 (06) : 2833 - 2853
  • [49] A neutrosophic set-based TLBO algorithm for the flexible job-shop scheduling problem with routing flexibility and uncertain processing times
    Liangliang Jin
    Chaoyong Zhang
    Xiaoyu Wen
    Chengda Sun
    Xinjiang Fei
    [J]. Complex & Intelligent Systems, 2021, 7 : 2833 - 2853
  • [50] The performance of Due Date setting rules in assembly and multi-stage job shops: an assessment by simulation
    Thuerer, Matthias
    Huang, George
    Stevenson, Mark
    Silva, Cristovao
    Godinho Filho, Moacir
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 5949 - 5965