共 50 条
- [21] Field study of longwall fully-mechanized caving mining by overburden isolated grouting under a surface railway tunnel Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2023, 40 (05): : 1102 - 1110
- [23] Algorithm of probabilistic assessment of fully-mechanized longwall downtime INTERNATIONAL SCIENTIFIC AND RESEARCH CONFERENCE ON KNOWLEDGE-BASED TECHNOLOGIES IN DEVELOPMENT AND UTILIZATION OF MINERAL RESOURCES (KTDMUR2017), 2017, 84
- [24] Method for determining the load on and width of coal pillar at the recovery room end of fully-mechanized longwall mining Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2015, 44 (06): : 990 - 995
- [25] A Study on the Optimized Working Schedule of the Fully Mechanized Coal Mining 2020 55TH INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE (UPEC), 2020,
- [26] Overlying strata movement law in fully mechanized coal mining and backfilling longwall face by similar physical simulation Journal of Mining Science, 2011, 47 : 618 - 627
- [28] Mechanical relation between support stiffness and longwall face stability within fully-mechanized mining faces Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2019, 48 (02): : 258 - 267
- [30] Geological factors affacted to mechanized longwall mining and its evaluation Coal Science and Technology (Peking), 1994, 22 (03):