Fully mechanized longwall mining with two shearers: A case study

被引:0
|
作者
Yuan, Y. [1 ]
Liu, H. [1 ]
Tu, S. [1 ]
Wei, H. [1 ]
Chen, Z. [1 ]
Jia, M. [2 ]
机构
[1] China Univ Min & Technol, Sch Mines, State Key Lab Coal Resources & Safe Min, Key Lab Deep Coal Resource Min,Minist Educ China, Xuzhou, Jiangsu, Peoples R China
[2] Yancon Grp Co Ltd, Shangyu, Peoples R China
基金
国家重点研发计划;
关键词
super-long working face; two shearers; AFC. 'snake' length; shearer modification; coal-cutting task allocation; COAL SEAM; FACE; PRODUCTIVITY; SIMULATION;
D O I
10.17159/2411-9717/2018/v118n10a9
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
To reduce production costs and increase efficiency in ageing coal mines, a system that utilizes two shearers in a fully mechanized longwall working face is proposed. Using theoretical and engineering experience, three issues pertaining to the system were determined: (a) the two-shearer mining technique; (b) matching and modifying the equipment; (c) and coal-cutting task allocation for each shearer. Two mining processes are proposed, with the two shearers travelling in either the same or opposing directions. To avoid breakage of chains and pan extrusion of the armoured face conveyor (AFC), the length of the AFC 'snake' was controlled. To ensure continuous cutting and transporting of coal, the cross-sectional dimensions of the AFC were checked and the shearer closer to the head drive was modified. Based on the assumption of equal cutting times for each shearer, the meeting position of the two shearers was obtained by using a theoretical model of mining task allocation. Application of this technique at No. 2 lining Mine, China, has shown remarkable benefits: daily production capacity was increased by 54% and personnel efficiency was improved by 33 t/d per person.
引用
收藏
页码:1079 / 1086
页数:8
相关论文
共 50 条
  • [1] Fully Mechanized Longwall Mining in an Underground Bauxite Deposit: A Case Study
    Wang S.
    Li X.
    Geotechnical and Geological Engineering, 2018, 36 (2) : 1231 - 1248
  • [2] Stability Control of the Equipment Recovery Passage in a Fully Mechanized Longwall Mining: Case Study
    Zhiyi Zhang
    Hui Chen
    Dongfa Li
    Zhiqiang Zhang
    Geotechnical and Geological Engineering, 2021, 39 : 799 - 813
  • [3] Stability Control of the Equipment Recovery Passage in a Fully Mechanized Longwall Mining: Case Study
    Zhang, Zhiyi
    Chen, Hui
    Li, Dongfa
    Zhang, Zhiqiang
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (02) : 799 - 813
  • [4] Study on match technology for fully mechanized longwall coal mining face
    Xu, Gang
    Meitan Xuebao/Journal of the China Coal Society, 2010, 35 (11): : 1921 - 1924
  • [5] PIONEERING OF FULLY MECHANIZED LONGWALL COAL MINING IN SOUTH AFRICA
    NAUDE, RT
    DEATS, MJ
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1967, 67 (07): : 322 - &
  • [6] PIONEERING OF FULLY MECHANIZED LONGWALL COAL MINING IN SOUTH AFRICA
    NAUDE, RT
    DEATS, MJ
    FOURIE, JC
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1967, 67 (11): : 621 - &
  • [7] Several problems of the old mining remnants in longwall fully mechanized mining technology
    Xu, Zhong-He
    Zhao, Yang-Sheng
    Gao, Hong-Bo
    Gong, Pei-Lin
    Meitan Xuebao/Journal of the China Coal Society, 2015, 40 : 33 - 39
  • [8] Structural characteristics of strata overlying of a fully mechanized longwall face: a case study
    Wang, J.
    Ning, J.
    Jiang, L.
    Jiang, J-Q
    Bu, T.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (11) : 1195 - 1204
  • [9] MECHANIZED LONGWALL MINING.
    Olson, James J.
    Tandanand, Sathit
    Information Circular - United States, Bureau of Mines, 1977, (8740):
  • [10] MECHANIZED LONGWALL MINING SYSTEM
    WALMSLEY, A
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (683): : 195 - &