Preparation for tritiated waste management of fusion facilities: Interim storage WAC

被引:1
|
作者
Decanis, C. [1 ]
Canas, D. [3 ]
Derasse, F. [1 ]
Pamela, J. [2 ]
机构
[1] CEA, DEN, Ctr Cadarache, F-13108 St Paul Les Durance, France
[2] CEA, Agence ITER France, F-13108 St Paul Les Durance, France
[3] CEA, Ctr Saclay, DEN DADN, F-91191 Gif Sur Yvette, France
关键词
Tritium; Tritiated waste; Fusion; Interim storage; Route; Disposal;
D O I
10.1016/j.fusengdes.2016.03.018
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Considering the high mobility of tritium through the package in which it is contained, the new 50-year storage concepts proposed by the French Alternative Energies and Atomic Energy Commission (CEA) currently provide a solution adapted to the management of waste with tritium concentrations higher than the accepted limits in the disposals. The 50-year intermediate storage corresponds to 4 tritium radioactive periods i.e., a tritium reduction by a factor 16. This paper details the approach implemented to define the waste acceptance criteria (WAC) for an interim storage facility that not only takes into account the specificity of tritium provided by the reference scheme for the management of tritiated waste in France, but also the producers' needs, the safety analysis of the facility and Andra's disposal requirements. This will lead to define a set of waste specifications that describe the generic criteria such as acceptable waste forms, general principles and specific issues, e.g. conditioning, radioactive content, tritium content, waste tracking system, and quality control. This approach is also a way to check in advance, during the design phase of the waste treatment chain, how the future waste could be integrated into the overall waste management routes and identify possible key points that need further investigations (design changes, selection of materials, etc.): the results obtained are shown. It supports the nuclear operator to ensure the compliance of the future waste packages with the disposal acceptance criteria. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:242 / 247
页数:6
相关论文
共 50 条
  • [41] HAZARDOUS WASTE DETOXICATION AT CONTRACT WASTE MANAGEMENT FACILITIES.
    Youngson, C.
    Ferriera, J.
    1982, : 3 - 39
  • [42] Integrated Risk Management in Mining Waste Facilities
    dos Reis, Gustavo Ramos Dantes
    de Oliveira, Jose Carlos
    Silva, Marcus Vinicius Abrahao Porto
    MINE WATER AND THE ENVIRONMENT, 2021, 40 (01) : 6 - 15
  • [43] Environmental Management of Quarries as Waste Disposal Facilities
    MUTASEM EL-FADEL
    SALAH SADEK
    WALID CHAHINE
    Environmental Management, 2001, 27 : 515 - 531
  • [44] Reduction of queuing delays at waste management facilities
    Wilson, BG
    Baetz, BW
    Hall, FL
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2002, 19 (04) : 311 - 331
  • [45] Waste management: milk-handling facilities
    Haskell, SRR
    Powers, EL
    Occhipinti, LP
    JOURNAL OF THE AMERICAN VETERINARY MEDICAL ASSOCIATION, 2003, 223 (01) : 50 - 50
  • [46] HANDLING EMERGENCIES IN HAZARDOUS WASTE MANAGEMENT FACILITIES
    STOVER, EL
    METRY, AA
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1979, (APR): : 117 - 117
  • [47] Radioactive waste management and decommissioning of accelerator facilities
    Ulrici, Luisa
    Magistris, Matteo
    RADIATION PROTECTION DOSIMETRY, 2009, 137 (1-2) : 138 - 148
  • [48] SITING HAZARDOUS-WASTE MANAGEMENT FACILITIES
    COX, GV
    PAULSON, G
    ASTM STANDARDIZATION NEWS, 1984, 12 (03): : 20 - 22
  • [49] Environmental management of quarries as waste disposal facilities
    El-Fadel, M
    Sadek, S
    Chahine, W
    ENVIRONMENTAL MANAGEMENT, 2001, 27 (04) : 515 - 531
  • [50] Waste-management facilities in remote areas
    Denney, D
    JOURNAL OF PETROLEUM TECHNOLOGY, 2004, 56 (07): : 69 - 70