共 50 条
- [41] Breaking Mechanism of Longwall Mining Face Roof under Room-and-Pillar Goaf of Shallow-buried Short Distance Coal Seams and Its Control DISASTER ADVANCES, 2013, 6 : 208 - 215
- [42] The Numerical Simulation Research on The Movement Rule of Rock Strata above The Coal Face with Shallow Buried Depth and Thin Bedrock PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2015, 8 : 33 - 37
- [46] Water inrush risk evaluation of coal mining under Quaternary alluvial water and reasonable design method of waterproof coal pillar Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2013, 30 (01): : 23 - 29
- [50] Water inrush mechanism and prevention for thick coal mining under an extremely thick glutenite layer: a case study in the southwest of the Ordos Basin Bulletin of Engineering Geology and the Environment, 2023, 82