An efficient alternative to the exact evaluation of the quickest path flow network reliability problem

被引:20
|
作者
El Khadiri, M. [1 ]
Yeh, W. -C. [2 ]
机构
[1] Univ Nantes, Dept Gest Logist & Transport, IUT St Nazaire, 58 Rue Michel Ange, F-44606 St Nazaire, France
[2] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Integrat & Collaborat Lab, Hsinchu, Taiwan
关键词
Arc capacity; Arc lead time; Flow network; Inclusion-Exclusion; Minimal Path; Monte-Carlo simulation; Path capacity; Path lead time; Path transmission time; Quickest path; Reliability; MINIMAL PATHS; SYSTEM RELIABILITY; TIME; ALGORITHMS; ENUMERATION; CONSTRAINT; BUDGET;
D O I
10.1016/j.cor.2016.06.010
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper we consider the evaluation of the probability that a stochastic flow network allows the transmission of a given amount of flow through one path, connecting the source and the sink node, within a fixed amount of time. This problem, called the quickest path flow network reliability problem, belongs to the NP-hard family. This implies that no polynomial algorithm is known for solving it exactly in a CPU runtime bounded by a polynomial function of the network size. As an alternative, we propose to perform estimations by a Monte Carlo simulation method. We illustrate that the proposed tool evaluates, with high precision and within small CPU runtime, configurations which cannot be handled, in reasonable CPU runtime, by means of a well-known exact method. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:22 / 32
页数:11
相关论文
共 50 条
  • [41] An efficient tabu search algorithm to the cell formation problem with alternative routings and machine reliability considerations
    Chung, Shu-Hsing
    Wu, Tai-Hsi
    Chang, Chin-Chih
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (01) : 7 - 15
  • [42] Efficient reliability computation of a multi-state flow network with cost constraint
    Niu, Yi-Feng
    Song, Yi-Fan
    Xu, Xiu-Zhen
    Zhao, Xia
    [J]. Reliability Engineering and System Safety, 2022, 222
  • [43] An Alternative Path Modelling Method for Air Traffic Flow Problem in Near Terminal Control Area
    Ng, K. K. H.
    Lee, C. K. M.
    Chan, Felix T. S.
    [J]. 2019 2ND INTERNATIONAL CONFERENCE ON INTELLIGENT AUTONOMOUS SYSTEMS (ICOIAS 2019), 2019, : 171 - 174
  • [44] Efficient reliability computation of a multi-state flow network with cost constraint
    Niu, Yi-Feng
    Song, Yi-Fan
    Xu, Xiu-Zhen
    Zhao, Xia
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 222
  • [45] An efficient algorithm for the evacuation problem in a certain class of a network with uniform path-lengths
    Kamiyama, Naoyuki
    Katoh, Naoki
    Takizawa, Atsushi
    [J]. ALGORITHMIC ASPECTS IN INFORMATION AND MANAGEMENT, PROCEEDINGS, 2007, 4508 : 178 - +
  • [46] RELIABILITY EVALUATION OF A LIMITED-FLOW NETWORK IN TERMS OF MINIMAL CUTSETS
    JANE, CC
    LIN, JS
    YUAN, J
    [J]. IEEE TRANSACTIONS ON RELIABILITY, 1993, 42 (03) : 354 - 361
  • [47] RELIABILITY EVALUATION OF A CAPACITATED-FLOW NETWORK IN TERMS OF MINIMAL PATHSETS
    LIN, JS
    JANE, CC
    YUAN, J
    [J]. NETWORKS, 1995, 25 (03) : 131 - 138
  • [48] RELIABILITY EVALUATION OF FLOW NETWORKS CONSIDERING MULTISTATE MODELING OF NETWORK ELEMENTS
    PATRA, S
    MISRA, RB
    [J]. MICROELECTRONICS AND RELIABILITY, 1993, 33 (14): : 2161 - 2164
  • [49] Reliability evaluation of a revised stochastic flow network with uncertain minimum time
    Lin, Yi-Kuei
    [J]. PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2010, 389 (06) : 1253 - 1258
  • [50] Evaluation of the reliability of the transport network based on the stochastic flow of the moving objects
    Wu, Weiwei
    Ning, Xuanxi
    [J]. Proceedings of the Fifth International Conference on Information and Management Sciences, 2006, 5 : 88 - 91