共 50 条
- [42] Real option analysis for capacity investment planning for semiconductor manufacturing [J]. ISSM 2007: 2007 INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, CONFERENCE PROCEEDINGS, 2007, : 305 - +
- [46] Distributionally Robust Coordinated Expansion Planning for Generation and Transmission Systems With Demand Response [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2021, 41 (20): : 6886 - 6899
- [47] Generation Capacity Expansion Planning under Demand Uncertainty Using Stochastic Mixed-Integer Programming [J]. 2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,