Study on Reasonable Coal Pillar Width of Gob-Side Roadway Excavating with Multi-Layer Hard Roof in Western Deep Mine

被引:7
|
作者
Han, Changliang [1 ]
Yang, Houqiang [1 ]
Zhang, Nong [1 ,2 ]
Li, Xudong [3 ]
Liu, Yitao [4 ]
Liu, Wentao [5 ]
Yao, Wei [4 ]
机构
[1] China Univ Min & Technol, Sch Mines, Minist Educ China, Key Lab Deep Coal Resource Min, Xuzhou 221116, Jiangsu, Peoples R China
[2] Jiangsu Normal Univ, Open Lab, Xuzhou 221116, Jiangsu, Peoples R China
[3] China Coal Northwest Energy Corp Ltd, Erdos 017200, Peoples R China
[4] Ordos Yihua Min Resources Co Ltd, Ordos 017000, Peoples R China
[5] China Coal Energy Res Inst Co Ltd, Xian 710054, Shaanxi, Peoples R China
关键词
Deep buried; Hard roof; Gob-side roadway excavating; Stability control; Reasonable coal pillar width;
D O I
10.1007/s10706-021-01972-z
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Gob-side roadway excavating could not only notably reduce the loss of coal resources and improve the coal recovery rates, but also greatly mitigate the imbalance between excavation speed and production needs. However, it is difficult to determine the coal pillar reasonable width of gob-side roadway under the condition of deep buried high stress and multiple key strata superimposed disturbance in the West. With Auxiliary transportation roadway 30207 (ATR 30207) in Muduchaideng Coal Mine as the research background, in situ investigation, theoretical calculation were carried out to study the reasonable width of coal pillar in gob-side roadway under the condition of deep buried high stress multi key seam mining. Results showed that, based on the width of stress reduction zone, two factor control of stress intensity, ratio optimization of width and height and effective anchor width, the optimal width of coal pillar of ATR 30207 is 5.5- 7.7 m. The stability of coal pillar and roadway under different width of coal pillar was simulated and analyzed by using UDEC numerical calculation. The calculation results showed that 6 m width coal pillar was the inflection point of vertical stress, plastic zone and displacement distribution, that is, 6 m width coal pillar was the best width of coal pillar, which verified the theoretical calculation results. This study provides a reference for the scientific mining under the condition of strong mining and high stress mining in Western China.
引用
收藏
页码:1417 / 1428
页数:12
相关论文
共 50 条
  • [1] Study on Reasonable Coal Pillar Width of Gob-Side Roadway Excavating with Multi-Layer Hard Roof in Western Deep Mine
    Changliang Han
    Houqiang Yang
    Nong Zhang
    Xudong Li
    Yitao Liu
    Wentao Liu
    Wei Yao
    [J]. Geotechnical and Geological Engineering, 2022, 40 : 1417 - 1428
  • [2] Numerical research on reasonable width of coal pillar in the double gob-side entries
    Si, Xin-Yan
    Wang, Wen-Qing
    Shao, Wen-Gang
    [J]. Si, X.-Y. (qymkswgt@163.com), 1600, China University of Mining and Technology (29): : 215 - 219
  • [3] Width determination of protection coal pillar of gob-side entry driving in coal mine
    School of Safety Engineering, Henan University of Engineering, Zhengzhou, Henan
    451191, China
    不详
    100083, China
    [J]. Electron. J. Geotech. Eng., 23 (7481-7490):
  • [4] Mechanism of roof cutting and pressure relief in gob-side and high-stress roadway in deep coal mine
    Su C.
    Gong P.
    Kang H.
    Li C.
    Yi K.
    Liu C.
    Li P.
    [J]. 1600, China University of Mining and Technology (37): : 1104 - 1113
  • [5] Reasonable Width of Narrow Coal Pillar of Gob-side Entry Driving in Large Mining Height
    Ming, Zhao
    Shuai, Zhang
    Yong, Chen
    [J]. 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2017, 59
  • [6] Roof Cutting Parameters Design for Gob-Side Entry in Deep Coal Mine: A Case Study
    Fan, Deyuan
    Liu, Xuesheng
    Tan, Yunliang
    Song, Shilin
    Gu, Qingheng
    Yan, Lei
    Xu, Qiang
    [J]. ENERGIES, 2019, 12 (10):
  • [7] Research on reasonable coal pillar width of roadway driven along goaf in deep mine
    Wang, Qi
    Gao, Hongke
    Jiang, Bei
    Li, Shucai
    He, Manchao
    Wang, Dechao
    Lu, Wei
    Qin, Qian
    Gao, Song
    Yu, Hengchang
    [J]. ARABIAN JOURNAL OF GEOSCIENCES, 2017, 10 (21)
  • [8] Research on reasonable coal pillar width of roadway driven along goaf in deep mine
    Qi Wang
    Hongke Gao
    Bei Jiang
    Shucai Li
    Manchao He
    Dechao Wang
    Wei Lu
    Qian Qin
    Song Gao
    Hengchang Yu
    [J]. Arabian Journal of Geosciences, 2017, 10
  • [9] Characteristics of overburden stress distribution and rational pillar width determination of gob-side roadway with thick and hard basic roof in fully mechanized top coal caving workface
    Jiang W.
    Ju W.
    Wang Z.
    Zhang Z.
    Shi M.
    [J]. Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2020, 37 (06): : 1142 - 1151
  • [10] Coal burst mechanism and prevention of large coal pillar gob-side heading face in deep mine
    Zhang, Ming
    Yang, Shiji
    Tu, Min
    Nian, Bin
    Liu, Tongda
    Du, Yan
    Wang, Dezhen
    Chang, Chunfeng
    Wu, Xiaojun
    Li, Jie
    [J]. Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2024, 41 (04): : 688 - 698