Roof Cutting Parameters Design for Gob-Side Entry in Deep Coal Mine: A Case Study

被引:42
|
作者
Fan, Deyuan [1 ]
Liu, Xuesheng [1 ,2 ]
Tan, Yunliang [1 ]
Song, Shilin [1 ]
Gu, Qingheng [1 ]
Yan, Lei [3 ]
Xu, Qiang [1 ]
机构
[1] Shandong Univ Sci & Technol, State Key Lab Min Disaster Prevent & Control, Qingdao 266590, Shandong, Peoples R China
[2] China Univ Min & Technol, State Key Lab Coal Resources & Safe Min, Xuzhou 221116, Jiangsu, Peoples R China
[3] Xinwen Min Grp Co Ltd, Suncun Coal Mine, Tai An 271233, Shandong, Peoples R China
来源
ENERGIES | 2019年 / 12卷 / 10期
基金
国家重点研发计划; 中国国家自然科学基金;
关键词
roof cutting; mechanical model; numerical simulation; gob-side entry; parameters determination; CEMENTED PASTE BACKFILL; DAMAGE CONSTITUTIVE MODEL; ABUTMENT PRESSURE; SUPPORT-SYSTEM; INTACT ROCK; STRATA; DISSIPATION; STABILITY; EVOLUTION; STRENGTH;
D O I
10.3390/en12102032
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Roof cutting is an effective technique for controlling the deformation and failure of the surrounding rock in deep gob-side entry. The determination of the roof cutting parameters has become a popular research subject. Initially, two mechanical models are established for the non-roof-cutting and roof-cutting of gob-side entry in deep mining conditions. On this basis, the necessity and significance of roof cutting is revealed by analysing the stress and displacement of roadside prop. The Universal Distinct Element Code numerical simulation model is established to determine the key roof-cutting parameters (cutting angle and cutting height) according to the on-site situation of No. 2415 headentry of the Suncun coal mine, China. The numerical simulation results show that with the cutting angle and height increase, the vertical stress and horizontal displacement of the coal wall first increase and then decrease, as in the case of the vertical stress and displacement of roadside prop. Therefore, the optimum roof cutting parameters are determined as a cutting angle of 70 degrees and cutting height of 8 m. Finally, a field application was performed at the No. 2415 headentry of the Suncun coal mine. In situ investigations show that after 10 m lagged the working face, the stress and displacement of roadside prop are obviously reduced with the hanging roof smoothly cut down, and they are stable at 19 MPa and 145 mm at 32 m behind the working face, respectively. This indicates that the stability of the surrounding rock was effectively controlled. This research demonstrates that the key parameters determined through a numerical simulation satisfactorily meet the production requirements and provide a reference for ensuring safe production in deep mining conditions.
引用
收藏
页数:25
相关论文
共 50 条
  • [1] Determination of key parameters of gob-side entry retaining by cutting roof and its application to a deep mine
    Chen S.-Y.
    Zhao F.
    Wang H.-J.
    Yuan G.-X.
    Guo Z.-B.
    Yang J.
    [J]. Yantu Lixue/Rock and Soil Mechanics, 2019, 40 (01): : 332 - 342and350
  • [2] Key Parameters of Roof Cutting of Gob-Side Entry Retaining in a Deep Inclined Thick Coal Seam with Hard Roof
    Hu, Jinzhu
    He, Manchao
    Wang, Jiong
    Ma, Zimin
    Wang, Yajun
    Zhang, Xingyu
    [J]. ENERGIES, 2019, 12 (05):
  • [3] Novel Application of the Roof-Cutting-Type Gob-Side Entry Retaining in Coal Mine
    Wang, Jiong
    Li, Wenfei
    Zhu, Daoyong
    Gong, Weili
    Su, Yi
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [4] Novel Application of the Roof-Cutting-Type Gob-Side Entry Retaining in Coal Mine
    Wang, Jiong
    Li, Wenfei
    Zhu, Daoyong
    Gong, Weili
    Su, Yi
    [J]. Mathematical Problems in Engineering, 2021, 2021
  • [5] Research on the Design of Roof Cutting Parameters of Non Coal Pillar Gob-side Entry Retaining Mining with Roof Cutting and Pressure Releasing
    Ma Xingen
    He Manchao
    Sun Jiandong
    Hu Jie
    Zhang Xingyu
    Zhang Jiabin
    [J]. Geotechnical and Geological Engineering, 2019, 37 : 1169 - 1184
  • [6] Research on the Design of Roof Cutting Parameters of Non Coal Pillar Gob-side Entry Retaining Mining with Roof Cutting and Pressure Releasing
    Ma Xingen
    He Manchao
    Sun Jiandong
    Hu Jie
    Zhang Xingyu
    Zhang Jiabin
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (03) : 1169 - 1184
  • [7] Research on Surrounding Rock Control Technology of Gob-Side Entry Retaining by Directional Roof Cutting in a Deep Coal Mine
    Haojie Xue
    Shibao Shen
    Haoran Lu
    Renbao Zhao
    Peishuai Li
    Yawei Zhao
    Qibin Jiang
    Longjiang Wang
    Beizhan Fan
    Tao Qin
    [J]. Geotechnical and Geological Engineering, 2022, 40 : 2117 - 2125
  • [8] Research on Surrounding Rock Control Technology of Gob-Side Entry Retaining by Directional Roof Cutting in a Deep Coal Mine
    Xue, Haojie
    Shen, Shibao
    Lu, Haoran
    Zhao, Renbao
    Li, Peishuai
    Zhao, Yawei
    Jiang, Qibin
    Wang, Longjiang
    Fan, Beizhan
    Qin, Tao
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2022, 40 (04) : 2117 - 2125
  • [9] Mine Pressure Behavior of Gob-Side Entry Retaining by Roof Cutting in Closely Spaced Coal Seams
    Guo, Pengfei
    Deng, Shiwei
    Jin, Zhupeng
    Zhu, Xingyu
    Wang, Yuanyuan
    Ta, Burui
    Kong, Xiangwu
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2024, 42 (01) : 611 - 630
  • [10] Mine Pressure Behavior of Gob-Side Entry Retaining by Roof Cutting in Closely Spaced Coal Seams
    Pengfei Guo
    Shiwei Deng
    Zhupeng Jin
    Xingyu Zhu
    Yuanyuan Wang
    Burui Ta
    Xiangwu Kong
    [J]. Geotechnical and Geological Engineering, 2024, 42 : 611 - 630