Operation of the GTS-LHC source for the hadron injector at CERN

被引:0
|
作者
Dumas, L. [1 ]
Hill, C.
Hitz, D.
Kuechler, D.
Mastrostefano, C.
O'Neil, M.
Scrivens, R.
机构
[1] CERN, AB ABP HSL, CH-1211 Geneva 23, Switzerland
[2] CEA, DRFMC SBT, F-38054 Grenoble 9, France
关键词
operation; linear accelerator; metal ions; bias disk;
D O I
暂无
中图分类号
O57 [原子核物理学、高能物理学];
学科分类号
070202 ;
摘要
The GTS-LHC ion source, designed and build by CEA Grenoble, was installed and commissioned at GERN in 2005. Since than the source has delivered oxygen and lead ion beams (O4+ and Pb27+ from the source, Pb54+ from the linac) for the commissioning of the Low Energy Ion Ring (LEIR). Results of this operation and attempts to improve the source performance and reliability, and the linac performance will be presented in this paper.
引用
收藏
页码:51 / 54
页数:4
相关论文
共 5 条
  • [1] Angert N., 1993, 9301 CERN
  • [2] Hill CE, 2005, AIP CONF PROC, V749, P127, DOI 10.1063/1.1893381
  • [3] Effect of a biased probe on the afterglow operation of an ECR4 ion source
    Hill, CE
    Küchler, D
    Wenander, F
    Wolf, BH
    [J]. REVIEW OF SCIENTIFIC INSTRUMENTS, 2000, 71 (02): : 863 - 865
  • [4] HILL CE, 2006, P 3 LHC PROJ WORKSH, P239
  • [5] Zavodszky PA, 2001, AIP CONF PROC, V576, P619, DOI 10.1063/1.1395385