Guided simulation for dynamic probabilistic risk assessment of complex systems: Concept, method, and application

被引:25
|
作者
Hu, Yunwei [1 ]
Parhizkar, Tarannom [2 ]
Mosleh, Ali [2 ]
机构
[1] Univ Maryland, Dept Mech Engn, Reliabil Engn Program, College Pk, MD 20742 USA
[2] Univ Calif Los Angeles, B John Garrick Inst Risk Sci, 404 Westwood Plaza, Los Angeles, CA 90095 USA
基金
美国国家航空航天局;
关键词
Dynamic probabilistic risk assessment; Guided simulation; Complex system; Hardware; software; and humans' interactions; Space Shuttle; QUALITATIVE SIMULATION; RELIABILITY-ANALYSIS; IDAC;
D O I
10.1016/j.ress.2021.108047
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Probabilistic risk assessment (PRA) is a systematic process of examining how engineered systems work to ensure safety. With the growth of the size of dynamic systems and the complexity of the interactions between hardware, software, and humans, it is extremely difficult to enumerate risky scenarios by the traditional PRA methods. In this study, a new dynamic probabilistic risk assessment methodology is proposed that employs a new exploration strategy to generate risky scenarios. The proposed methodology consists of three main modules, including simulation, planner, and scheduler. In this methodology, the engineering knowledge of the system is explicitly used to guide the simulation module to achieve higher efficiency and accuracy. The engineering knowledge is reflected in the planner module which is responsible for generating plans as a high-level map to guide the simulation. The scheduler module is responsible for guiding the simulation by controlling the timing and occurrence of the random events. In this paper, modules of the proposed methodology, and their interactions are explained in detail. The developed methodology is used to perform risk assessment of a Space Shuttle ascent phase, and results show the effectiveness of the proposed platform.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Probabilistic risk assessment modeling of digital instrumentation and control systems using two dynamic methodologies
    Aldemir, T.
    Guarro, S.
    Mandelli, D.
    Kirschenbaum, J.
    Mangan, L. A.
    Bucci, P.
    Yau, M.
    Ekici, E.
    Miller, D. W.
    Sun, X.
    Arndt, S. A.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2010, 95 (10) : 1011 - 1039
  • [42] Concept of the risk evaluation possibilities in complex systems
    Esipov, YV
    [J]. AUTOMATION AND REMOTE CONTROL, 2003, 64 (07) : 1022 - 1028
  • [43] Concept of the Risk Evaluation Possibilities in Complex Systems
    Yu. V. Esipov
    [J]. Automation and Remote Control, 2003, 64 : 1022 - 1028
  • [44] The characterization of uncertainty in probabilistic risk assessments of complex systems
    Parry, GW
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 1996, 54 (2-3) : 119 - 126
  • [45] Application of the probabilistic dynamic synthesis method to realistic structures
    Brown, AM
    Ferri, AA
    [J]. AIAA JOURNAL, 1999, 37 (10) : 1292 - 1297
  • [46] Dynamic probabilistic risk assessment considering the domino effect in chemical parks based on Monte Carlo simulation
    Hu, Hong
    Lan, Meng
    Qin, Rongshui
    Zhu, Jiping
    [J]. Process Safety and Environmental Protection, 2025, 193 : 856 - 873
  • [47] THE APPLICATION OF PROBABILISTIC RISK ASSESSMENT TECHNIQUES TO ENERGY TECHNOLOGIES
    RASMUSSEN, NC
    [J]. ANNUAL REVIEW OF ENERGY, 1981, 6 : 123 - 138
  • [48] Dairy manure management: An application of probabilistic risk assessment
    Johnson, A
    Thurow, AP
    Vietor, D
    [J]. JOURNAL OF ENVIRONMENTAL QUALITY, 1998, 27 (03) : 481 - 487
  • [49] An Application of Probabilistic Risk Assessment to Information Security Audit
    Satoh, Naoki
    Kumamoto, Hiromitsu
    [J]. AIC '09: PROCEEDINGS OF THE 9TH WSEAS INTERNATIONAL CONFERENCE ON APPLIED INFORMATICS AND COMMUNICATIONS: RECENT ADVANCES IN APPLIED INFORMAT AND COMMUNICATIONS, 2009, : 436 - +
  • [50] Application of Probabilistic Risk Assessment Technology in Aerospace Model
    Cui Tiezheng
    Li Wenzhao
    Li Haisheng
    [J]. 2019 THE WORLD SYMPOSIUM ON SOFTWARE ENGINEERING (WSSE 2019), 2015, : 22 - 26