Benders Decomposition on Large-Scale Unit Commitment Problems for Medium-Term Power Systems Simulation

被引:1
|
作者
Taverna, Andrea [1 ]
机构
[1] Univ Milan, Via Saldini 50, Milan, Italy
关键词
D O I
10.1007/978-3-319-55702-1_25
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The Unit Commitment Problem (UCP) aims at finding the optimal commitment for a set of thermal power plants in a Power System (PS) according to some criterion. Our work stems from a collaboration with RSE S.p.A., a major industrial research centre for PSs in Italy. In this context the UCP is formulated as a large-scale MILP spanning countries over a year with hourly resolution to simulate the ideal behaviour of the system in different scenarios. Our goal is to refine existing heuristic solutions to increase simulation reliability. In our previous studies we devised a Column Generation algorithm (CG) which, however, shows numerical instability due to degeneracy in the master problem. Here we evaluate the application of Benders Decomposition (BD), which yields better conditioned subproblems. We also employ Magnanti-Wong cuts and a "two-phases scheme", which first quickly computes valid cuts by applying BD to the continuous relaxation of the problem and then restores integrality. Experimental results on weekly instances for the Italian system show the objective function to be flat. Even if such a feature worsens convergence, the algorithm is able to reach almost optimal solutions in few iterations.
引用
收藏
页码:179 / 184
页数:6
相关论文
共 50 条
  • [31] An Improved Differential Evolution Scheme for the Solution of Large-Scale Unit Commitment Problems
    Chang, Chen-Sung
    [J]. INFORMATICA, 2010, 21 (02) : 175 - 190
  • [32] A Novel Solution Methodology for Solving Large-scale Thermal Unit Commitment Problems
    Xie, Yu-Guang
    Chiang, Hsiao-Dong
    [J]. ELECTRIC POWER COMPONENTS AND SYSTEMS, 2010, 38 (14) : 1615 - 1634
  • [33] Learning to Solve Large-Scale Security-Constrained Unit Commitment Problems
    Xavier, Alinson S.
    Qiu, Feng
    Ahmed, Shabbir
    [J]. INFORMS JOURNAL ON COMPUTING, 2021, 33 (02) : 739 - 756
  • [34] Parallel domain decomposition for simulation of large-scale power grids
    Sun, Kai
    Zhou, Quming
    Mohanram, Kartik
    Sorensen, Danny C.
    [J]. IEEE/ACM INTERNATIONAL CONFERENCE ON COMPUTER-AIDED DESIGN DIGEST OF TECHNICAL PAPERS, VOLS 1 AND 2, 2007, : 54 - +
  • [35] A Heuristic algorithm to solve the unit commitment problem for real-life large-scale power systems
    Alvarez Lopez, Juan
    Ceciliano-Meza, Jose L.
    Guillen, Isaias
    Nieva Gomez, Rolando
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 49 : 287 - 295
  • [36] Modeling and Optimization of the Medium-Term Units Commitment of Thermal Power
    Liao, Shengli
    Li, Zhifu
    Li, Gang
    Wang, Jiayang
    Wu, Xinyu
    [J]. ENERGIES, 2015, 8 (11): : 12848 - 12864
  • [37] A Fast Calculation Method for Long-term Security-constrained Unit Commitment of Large-scale Power Systems with Renewable Energy
    Yang, Qian
    Wang, Jianxue
    Yin, Hongrui
    Li, Qingtao
    [J]. JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2022, 10 (05) : 1127 - 1137
  • [38] A Fast Calculation Method for Long-term Security-constrained Unit Commitment of Large-scale Power Systems with Renewable Energy
    Qian Yang
    Jianxue Wang
    Hongrui Yin
    Qingtao Li
    [J]. Journal of Modern Power Systems and Clean Energy, 2022, 10 (05) : 1127 - 1137
  • [39] Monthly unit commitment and security assessment algorithm for large-scale power system
    NARI Technology Development Co. Ltd., Nanjing 210003, China
    不详
    不详
    [J]. Dianli Xitong Zidonghue, 2008, 23 (28-30):
  • [40] Ordinal Optimization Theory to Solve Large-Scale Power System Unit Commitment
    Xie, Min
    Zhu, Yanhan
    Ke, Shaojia
    Du, Yuxin
    Liu, Mingbo
    [J]. IEEJ TRANSACTIONS ON ELECTRICAL AND ELECTRONIC ENGINEERING, 2018, 13 (02) : 187 - 194