A new Markov-chain-related statistical approach for modelling synthetic wind power time series

被引:26
|
作者
Pesch, T. [1 ]
Schroeders, S. [2 ]
Allelein, H. J. [2 ]
Hake, J. F. [1 ]
机构
[1] Forschungszentrum Julich, Inst Energy & Climate Res Syst Anal & Technol Eva, D-52425 Julich, Germany
[2] Rhein Westfal TH Aachen, Inst Reactor Safety & Reactor Technol, D-52072 Aachen, Germany
来源
NEW JOURNAL OF PHYSICS | 2015年 / 17卷
关键词
renewable energy; Markov chain; stochastic modelling; wind power; energy system model; Markov process; synthetic time series; GENERATION; ENERGY; SPEEDS; OUTPUT;
D O I
10.1088/1367-2630/17/5/055001
中图分类号
O4 [物理学];
学科分类号
0702 ;
摘要
The integration of rising shares of volatile wind power in the generation mix is a major challenge for the future energy system. To address the uncertainties involved in wind power generation, models analysing and simulating the stochastic nature of this energy source are becoming increasingly important. One statistical approach that has been frequently used in the literature is the Markov chain approach. Recently, the method was identified as being of limited use for generating wind time series with time steps shorter than 15-40 min as it is not capable of reproducing the autocorrelation characteristics accurately. This paper presents a new Markov-chain-related statistical approach that is capable of solving this problem by introducing a variable second lag. Furthermore, additional features are presented that allow for the further adjustment of the generated synthetic time series. The influences of the model parameter settings are examined by meaningful parameter variations. The suitability of the approach is demonstrated by an application analysis with the example of the wind feed-in in Germany. It shows that-in contrast to conventional Markov chain approaches-the generated synthetic time series do not systematically underestimate the required storage capacity to balance wind power fluctuation.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Machine Reliability Modelling in Manufacturing: A Continuous-Time State-Dependent Heterogeneous Markov Chain Approach
    Li, Na
    Yu, Xin
    Zhang, Mike
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 1050 - 1054
  • [42] A Continuous Time Markov Chain Based Sequential Analytical Approach for Composite Power System Reliability Assessment
    Hou, Kai
    Jia, Hongjie
    Xu, Xiandong
    Liu, Zhe
    Jiang, Yilang
    [J]. 2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
  • [43] A Continuous Time Markov Chain Based Sequential Analytical Approach for Composite Power System Reliability Assessment
    Hou, Kai
    Jia, Hongjie
    Xu, Xiandong
    Liu, Zhe
    Jiang, Yilang
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (01) : 738 - 748
  • [44] Wind Power Time Series Aggregation Approach Based on Affinity Propagation Clustering and MCMC Algorithm
    Ye, Lin
    Li, Jiachen
    Lu, Peng
    Zhai, Qingzhi
    Li, Pai
    Wang, Weisheng
    Dong, Ling
    [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2020, 40 (12): : 3744 - 3753
  • [45] A new high-dimensional time series approach for wind speed, wind direction and air pressure forecasting
    Ambach, Daniel
    Schmid, Wolfgang
    [J]. ENERGY, 2017, 135 : 833 - 850
  • [46] Wind Power Pattern Prediction in time series measuremnt data for wind energy prediction modelling using LSTM-GA networks
    Vaitheeswaran, Sowmya Sevoor
    Ventrapragada, Varun Raj
    [J]. 2019 10TH INTERNATIONAL CONFERENCE ON COMPUTING, COMMUNICATION AND NETWORKING TECHNOLOGIES (ICCCNT), 2019,
  • [47] A new uncertain fault diagnosis approach of power system based on markov chain Monte Carlo method
    Zhao, Wei
    Bai, Xiaomin
    Ding, Jian
    Fang, Zhu
    Li, Zaihua
    Zhou, Ziguan
    [J]. 2006 International Conference on Power Systems Technology: POWERCON, Vols 1- 6, 2006, : 735 - 740
  • [48] A new wind speed forecasting strategy based on the chaotic time series modelling technique and the Apriori algorithm
    Guo, Zhenhai
    Chi, Dezhong
    Wu, Jie
    Zhang, Wenyu
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2014, 84 : 140 - 151
  • [49] Comparative Assessment of Wind Speed Predictive Capability of First-and Second-order Markov Chain at Different Time Horizons for Wind Power Application
    Ayodele, T.R.
    Ogunjuyigbe, A.S.O.
    Olarewaju, R.O.
    Munda, J.L.
    [J]. Energy Engineering: Journal of the Association of Energy Engineering, 2019, 116 (03): : 54 - 80
  • [50] A new statistical-dynamical downscaling procedure for high-resolution time series and wind atlas generation
    Martinez, Yosvany
    Yu, Wei
    Lin, Hai
    [J]. INTERNATIONAL WORK-CONFERENCE ON TIME SERIES (ITISE 2014), 2014, : 1329 - 1329