Mixture densities for project management activity times: A robust approach to PERT

被引:66
|
作者
Hahn, Eugene David [1 ]
机构
[1] Salisbury Univ, Dept Informat & Decis Sci, Franklin P Perdue Sch Business, Salisbury, MD 21801 USA
关键词
finite mixture; beta rectangular distribution; robust project management; activity times; outliers;
D O I
10.1016/j.ejor.2007.04.032
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
PERT is a widely utilized framework for project management. However, as a result of underlying assumptions about the activity times, the PERT formulas prescribe a light-tailed distribution with a constant variance conditional on the range. Given the pervasiveness of heavy-tailed phenomena in business contexts as well as inherently differing levels of uncertainty about different activities, there is a need for a more flexible distribution which allows for varying amounts of dispersion and greater likelihoods of more extreme tail-area events. In particular, we argue that the tail-area decay of an activity time distribution is a key factor which has been insufficiently considered previously. We provide a distribution which permits varying amounts of dispersion and greater likelihoods of more extreme tail-area events that is straightforward to implement with expert judgments. Moreover, the distribution can be integrated into the PERT framework such that the classic PERT results represent an important special case of the method presented here. (c) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:450 / 459
页数:10
相关论文
共 50 条
  • [41] Algorithmic Approach for Overhauling of Modern Bulldozers thorough Management Techniques (PERT/CPM)
    Selvan, M. Muthamil
    Durairaj, C. Divaker
    Rangasamy, K.
    Hemalatha, R.
    [J]. AMA-AGRICULTURAL MECHANIZATION IN ASIA AFRICA AND LATIN AMERICA, 2011, 42 (04): : 33 - 36
  • [42] CONSTRUCTION PROJECTS RISK ASSESSMENT BASED ON PERT, CPM AND PROJECT MANAGEMENT WITH FUZZY LOGIC TECHNIQUE
    Soni, Akash
    Kumar, Ramesh
    Shrivastava, Amit
    [J]. ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2022, 21 (09): : 5385 - 5395
  • [43] Project management - An integrated approach
    Dawes, Terry
    [J]. 2002, Institute of Administrative Management, 55-57 High Holborn, United Kingdom
  • [44] A Fuzzy Approach for the Project Management
    Li Feng
    Wei Junyin
    [J]. 2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5180 - 5183
  • [45] Skunkworks approach to project management
    Bommer, M
    DeLaPorte, R
    Higgins, J
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (01) : 21 - 28
  • [46] A robust search-based approach to project management in the presence of abandonment, rework, error and uncertainty
    Antoniol, G
    Di Penta, M
    Harman, M
    [J]. 10TH INTERNATIONAL SYMPOSIUM ON SOFTWARE METRICS, PROCEEDINGS, 2004, : 172 - 183
  • [47] Proposal of ECDIS simulation tests for dredging activity in seaports: A project management approach
    Kaizer, Adam
    [J]. SCIENTIFIC JOURNALS OF THE MARITIME UNIVERSITY OF SZCZECIN-ZESZYTY NAUKOWE AKADEMII MORSKIEJ W SZCZECINIE, 2023, 73 (145): : 29 - 34
  • [48] Adjustment of the moments of the project completion times when activity times are exponentially distributed
    Abdelkader, Yousry H.
    [J]. ANNALS OF OPERATIONS RESEARCH, 2010, 181 (01) : 503 - 514
  • [49] Adjustment of the moments of the project completion times when activity times are exponentially distributed
    Yousry H. Abdelkader
    [J]. Annals of Operations Research, 2010, 181 : 503 - 514
  • [50] Estimating project completion times - Simulation and analytic approach
    Gonen, Amnon
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1032 - 1036