Principles for the design and operation of engineer-to-order supply chains in the construction sector

被引:60
|
作者
Gosling, Jonathan [1 ]
Towill, Denis R. [1 ]
Naim, Mohamed M. [1 ]
Dainty, Andrew R. J. [2 ]
机构
[1] Cardiff Univ, Logist & Operat Management Sect, Logist Syst Dynam Grp, Cardiff CF10 3EU, S Glam, Wales
[2] Univ Loughborough, Sch Civil & Bldg Engn, Loughborough LE11 3TU, Leics, England
关键词
design-for-X; construction; supply chain; engineer-to-order; MANAGEMENT; MANUFACTURE; PRODUCTS; BULLWHIP; QUALITY; POWER;
D O I
10.1080/09537287.2014.880816
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
By integrating the approaches of Forrester and Burbidge [Forrester, J. W. 1961. Industrial Dynamics. Pegasus Communications; Burbidge, J. L. 1961. "The "New Approach" to Production." Production Engineer 40: 769-784], a set of five design principles have emerged which provide a foundation for sound supply chain design. The 'FORRIDGE' principles have since been shown to be a powerful guide for effective design of make-to-stock supply chains. However, some have questioned the applicability of generic supply chain thinking, arguing for a tailored approach. Hence, the goal here is to investigate how these principles should be adapted for engineer-to-order (ETO) industries, such as construction, capital goods and shipbuilding. The empirical elements draw on an extensive study of 12 suppliers and two large contractors in the construction industry. Supply chain tactics are identified for this range of companies, which are matched with real world problems, and linked with the FORRIDGE principles. This results in an additional 'Design for X' principle being proposed. The contributions made are the adaptation of established principles for the ETO sector, and the framework behind these principles.
引用
收藏
页码:203 / 218
页数:16
相关论文
共 50 条
  • [21] The System Dynamics of Engineer-to-Order Construction Projects: Past, Present, and Future
    Zhou, Yuxuan
    Wang, Xun
    Gosling, Jonathan
    Naim, Mohamed M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (05)
  • [22] Commercial and Technical Productization for Design Reuse in Engineer-to-Order Business
    Mustonen, Erno
    Harkonen, Janne
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2024, 71 : 1271 - 1284
  • [23] Modeling of modularity and scaling for integration of customer in design of engineer-to-order products
    Siddique, Z
    Ninan, JA
    [J]. INTEGRATED COMPUTER-AIDED ENGINEERING, 2006, 13 (02) : 133 - 148
  • [24] Improving coordination in an engineer-to-order supply chain using a soft systems approach
    Mello, Mario Henrique
    Gosling, Jonathan
    Naim, Mohamed M.
    Strandhagen, Jan Ola
    Brett, Per Olaf
    [J]. PRODUCTION PLANNING & CONTROL, 2017, 28 (02) : 89 - 107
  • [25] A grammatical approach for real-time design of engineer-to-order products
    Siddique, Zahed
    Ninan, Jiju A.
    [J]. JOURNAL OF ENGINEERING DESIGN, 2007, 18 (02) : 157 - 174
  • [26] Performance measurement in design engineering: A case study in an engineer-to-order company
    Sousa, GWL
    Venuto, JJ
    Coelho, RA
    Van Aken, EM
    [J]. ENGINEERING MANAGEMENT: IT'S ABOUT PEOPLE, PROCEEDINGS, 2001, : 364 - 373
  • [27] A Lean Approach for Real-Time Planning and Monitoring in Engineer-to-Order Construction Projects
    Dallasega, Patrick
    Rauch, Erwin
    Frosolini, Marco
    [J]. BUILDINGS, 2018, 8 (03)
  • [28] Adaptive generic product structure modelling for design reuse in engineer-to-order products
    Briere-Cote, Antoine
    Rivest, Louis
    Desrochers, Alain
    [J]. COMPUTERS IN INDUSTRY, 2010, 61 (01) : 53 - 65
  • [29] Operationalizing lean principles for lead time reduction in engineer-to-order (ETO) operations: A case study
    Strandhagen, Jo W.
    Vallandingham, Logan R.
    Alfnes, Erlend
    Strandhagen, Jan Ola
    [J]. IFAC PAPERSONLINE, 2018, 51 (11): : 128 - 133
  • [30] ENGINEER-TO-ORDER APPROACH TO HIGH SPEED BUCKET ELEVATOR DESIGN IN A SMALL ENTERPRISE
    Jaskulski, A.
    [J]. APPLIED ENGINEERING IN AGRICULTURE, 2008, 24 (05) : 545 - 557