ECONOMIC ASPECTS OF INTERLOCKING HOLLOW BRICK SYSTEM DESIGNED FOR INDUSTRIALIZED BUILDING SYSTEM

被引:2
|
作者
Tahir, Mahmood Md. [1 ]
Saggaff, Anis [2 ]
Ngian, Shek Poi [1 ]
Sulaiman, Arizu [1 ]
机构
[1] UTM, ISIIC, Construct Res Ctr, Fac Civil Engn, Johor Baharu 81310, Johor, Malaysia
[2] Univ Sriwijaya, Sch Civil Engn, Jl Raya Palembang Prabumulih Km 32 Indralaya, Sumatera Selatan 30662, Indonesia
关键词
D O I
10.1063/1.5011587
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction industry has moved forward into a technology driven where a transition is in progress from conventional method to a more advanced and mechanised system known as the Industrialised Building System (IBS). However, the need to implement the IBS should be well understood by all construction players such as designer, architect, contraction, erectors and construction workers. Therefore, there is a need to educate all these construction players which should be spearheaded by authorities such as Construction Industrial Development Board where enforcement trough building by laws as well as initiative to those that adopt the IBS in their construction. This paper reports on economic aspects of using interlocking hollow brick system in construction as an alternative method offered for Industrialized Building System. The main objective is to address the economic aspects of using interlocking block system in terms of time, costs, and utilization of manpower and to present some of the experimental tests results related to Interlocking Hollow Brick System (IHBS). Example of savings from the use of IHBS is presented in this paper by comparing the construction of two storey terrace house with build-up area of about 200 square meter with conventional construction method of typical reinforced concrete construction (RCC) compared to IHBS. The comparison shows that the implementation of IHBS can reduce construction time, cost, and utilization of man power up to 26.6% compared to the conventional method. Moreover, the construction time using IHBS can also be reduced by up to 50% as compared to the conventional construction.
引用
收藏
页数:5
相关论文
共 50 条
  • [31] Improvement for significant clauses in the standard form of contract for industrialized building system construction
    Fateh, Mohd Ashraf Mohd
    Zakariah, Hanah
    Ezanee, Shaiifa Ema
    2ND GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING, 2020, 713
  • [32] Conceptual Design Using Industrialized Building System for Affordable Housing Construction in Indonesia
    Syamsuri, E. U.
    Tahir, M. M.
    Basyaruddin, B. A.
    Sulaiman, A.
    Ngian, S. P.
    Bakri, A.
    ADVANCED SCIENCE LETTERS, 2018, 24 (06) : 4322 - 4325
  • [33] Preliminary study toward musculoskeletal disorders among industrialized building system workers
    Zan, Hussien Md.
    Yusop, Md. Saifuddin Md
    Shapie, Sinatu Sadiah
    Ishak, Rahim
    Mat, Shafizal
    PROCEEDINGS OF MECHANICAL ENGINEERING RESEARCH DAY 2018 (MERD), 2018, : 150 - 151
  • [34] Lock-brick system technology is an ecological building material innovation
    Susilawati, C. L.
    Suni, P. K. Yulius
    Tjandra, E.
    3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING (ICCEE 2019), 2020, 419
  • [35] SOFTWARE SYSTEM DESIGNED TO EVALUATE ECONOMIC-POTENTIAL
    不详
    OFFSHORE, 1983, 43 (11) : 75 - 75
  • [36] STATISTICAL EVALUATION OF PRE-SELECTION CRITERIA FOR INDUSTRIALIZED BUILDING SYSTEM (IBS)
    Azman, Mohamed Nor Azhari
    Ahamad, Mohd Sanusi S.
    Majid, Taksiah A.
    Yahaya, Ahmad Shukri
    Hanafi, Mohd Hanizun
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2013, 19 : S131 - S140
  • [37] Robotunits takes a Lego-brick approach to automation system building
    Connolly, Christine
    ASSEMBLY AUTOMATION, 2006, 26 (03) : 188 - 191
  • [38] Motivational Factors on Adopting Modular Coordination Concept in Industrialized Building System (IBS)
    Yunus, Riduan
    Suratkon, Azeanita
    Wimala, Mia
    Hamid, Hazrul Abdul
    Noor, Siti Rahimah Mohd
    3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING FOR SUSTAINABILITY (ICONCEES 2015), 2016, 47
  • [39] READINESS FOR INDUSTRIALIZED BUILDING SYSTEM IMPLEMENTATION AMONG MALAYSIAN ARCHITECTURAL FIRMS' MEMBERS
    Hanafi, Mohd Hanizun
    Abasa, Arniza
    Ibrahim, Fazdliel Aswad
    Abdullah, Shardy
    JURNAL TEKNOLOGI, 2016, 78 (07): : 195 - 203
  • [40] ENERGY, ENVIRONMENT AND ECONOMIC ANALYSIS OF DESIGNED TRIGENERATION SYSTEM
    Hergul, Ahmet Serhan
    Kaya, Durmus
    Coban, Volkan
    INTERNATIONAL JOURNAL OF ECOSYSTEMS AND ECOLOGY SCIENCE-IJEES, 2016, 6 (04): : 575 - 580