Design and Construction of a Cost-Oriented Mobile Robot for Domestic Assistance

被引:1
|
作者
Pallares O, Brayan S. [1 ]
Rozo M, Tatiana A. [1 ]
Camacho, Edgar C. [1 ]
Guillermo Guarnizo, Jose [1 ]
Calderon, Juan M. [2 ,3 ]
机构
[1] Univ Santo Tomas, Dept Elect Engn, Bogota, Colombia
[2] Bethune Cookman Univ, Daytona Beach, FL USA
[3] Univ Santo Tomas, Bogota, Colombia
来源
IFAC PAPERSONLINE | 2021年 / 54卷 / 13期
关键词
Mechatronic Systems and Robotics; Cost Oriented Automation(COA); Intelligent Systems and Applications; Social Robotics; Mobile Robot;
D O I
10.1016/j.ifacol.2021.10.462
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents the design and development of a cost -oriented mobile robot for domestic assistance. The design of the mechanics, electronics and software necessary for the operation of the robot is detailed, as well as the tests carried out to ensure its correct operation. Concluding that the controllers, kinematics, and odometry work correctly providing a measurement that is close to the real one. The developed robot can be easily equipped with multiple actuators to make it useful in different social tasks, such as: elderly supervision robot, medicine supply robot, companion robot for dependent people, telecare robot, among others. The robot design is focused on allowing its easy replication to be freely used in a large number of domestic applications. As future work, the development of a SLAM algorithm that allows the robot to operate autonomously is proposed. Copyright (C) 2021 The Authors.
引用
收藏
页码:293 / 298
页数:6
相关论文
共 50 条
  • [1] A cost-oriented robot for the Oil Industry
    Ibrahimov, Bahadur
    [J]. IFAC PAPERSONLINE, 2018, 51 (30): : 204 - 209
  • [2] A cost-oriented approach for the design of IT architectures
    Ardagna, D
    Francalanci, C
    [J]. JOURNAL OF INFORMATION TECHNOLOGY, 2005, 20 (01) : 32 - 51
  • [3] Obstacle Detection and Avoidance of a cost-oriented humanoid robot
    d'Apolito, F.
    [J]. IFAC PAPERSONLINE, 2018, 51 (30): : 198 - 203
  • [4] COST-ORIENTED ADJUSTMENT IN RELATION TO CONSTRUCTION SITE COMPLETION
    STEFFEN, R
    [J]. BETRIEBSWIRTSCHAFTLICHE FORSCHUNG UND PRAXIS, 1976, 28 (03): : 283 - 301
  • [5] Cost-oriented fire safety design of urban structures
    Irani, Matin
    Behnam, Behrouz
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 2024,
  • [6] Legs' Trajectory Generation for a Cost-Oriented Humanoid Robot: a Symmetrical Approach
    d'Apolito, F.
    [J]. IFAC PAPERSONLINE, 2019, 52 (25): : 95 - 99
  • [7] COST-ORIENTED USE OF BIOMASS
    WOERNLE, R
    MAYER, M
    [J]. CHEMIE INGENIEUR TECHNIK, 1985, 57 (08) : 711 - 711
  • [8] Design and Research for a Cost-Oriented Hybrid Electric Vehicle Architecture
    Zhang, Jianlong
    Wang, Lei
    Yin, Chengliang
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, DETC 2010, VOL 4, 2010, : 229 - 233
  • [9] Cost-oriented load forecasting
    Zhang, Jialun
    Wang, Yi
    Hug, Gabriela
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2022, 205
  • [10] Cost-Oriented Design Optimization of Single Building Curtain Wall
    Liu, Lei
    Wang, Lu
    Guo, Zhijian
    Luo, Zhiwei
    [J]. BUILDINGS, 2023, 13 (03)