The Cost of Speed: Work Policies for Crashing and Overlapping in Product Development Projects

被引:24
|
作者
Meier, Christoph [1 ]
Browning, Tyson R. [2 ]
Yassine, Ali A. [3 ]
Walter, Ulrich [1 ]
机构
[1] Tech Univ Munich, Inst Aeronaut, D-85748 Munich, Germany
[2] Texas Christian Univ, Neeley Sch Business, Ft Worth, TX 76129 USA
[3] Amer Univ Beirut, Dept Engn Management, Beirut 11072020, Lebanon
关键词
Crashing; iteration; overlapping; product development (PD); project management; time-cost tradeoffs; work policy; HEURISTIC RULES PERFORMANCE; DESIGN PROCESS; CYCLE TIME; INFORMATION; NETWORK; MODEL; MANAGEMENT; FRAMEWORK; SIMULATION; INNOVATION;
D O I
10.1109/TEM.2015.2411514
中图分类号
F [经济];
学科分类号
02 ;
摘要
Project management theory provides insufficient insight on the effects of crashing and overlapping in product development (PD) projects. The scholarly literature largely assumes that networks of project activities are acyclical. PD projects are iterative, however, and the time-cost implications of managerial actions, such as activity crashing and overlapping, differ in this context. We build a rich model that accounts for activity overlapping, crashing, and iteration in the project's activity network. Using a bank of thousands of artificial but realistic test problems, we test the performance of several alternative work policies-managerial rules about when to start work and rework, and when to allow crashing and overlapping-and compare their time-cost implications. We find that the time-cost benefits of crashing and overlapping increase with increasing iteration. However, whereas crashing works well in combination with an aggressive work policy that does not seek to minimize iteration and rework, overlapping ironically works better with a work policy that defers rework. No single work policy dominates in all situations, although an aggressive policy that precipitates rework may often be worth its added cost. We distill our findings into a set of propositions that pave the way for further theory development in this area. Our results also illuminate useful heuristics for managers of PD projects.
引用
收藏
页码:237 / 255
页数:19
相关论文
共 50 条
  • [21] Decisions in Product Platform Development Projects
    Harland, Peter E.
    Yoeruer, Haluk
    [J]. INTERNATIONAL JOURNAL OF INNOVATION AND TECHNOLOGY MANAGEMENT, 2015, 12 (01)
  • [22] Change decisions in product development projects
    Steffens, Wolfgang
    Martinsuo, Miia
    Artto, Karlos
    [J]. PROCEEDINGS OF IRNOP VII PROJECT RESEARCH CONFERENCE, 2006, : 419 - 434
  • [23] Change decisions in product development projects
    Steffens, Wolfgang
    Martinsuo, Miia
    Artto, Karlos
    [J]. International Journal of Project Management, 2007, 25 (07) : 702 - 713
  • [24] Decent work and development policies
    Fields, GS
    [J]. INTERNATIONAL LABOUR REVIEW, 2003, 142 (02) : 239 - +
  • [25] The Speed of New Product Development
    Euchner, Jim
    [J]. RESEARCH-TECHNOLOGY MANAGEMENT, 2021, 64 (05) : 9 - 10
  • [26] Product development with competence and speed
    [J]. International Paperworld IPW, 2021, (5-6): : 28 - 31
  • [27] Work structuring and product design for customized repetitive projects
    Gravina da Rocha, Cecilia
    Korb, Samuel
    Sacks, Rafael
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2022, 40 (7-8) : 526 - 547
  • [28] Coordination Policies in Product Development with Rework
    Bao, Bingyin
    Xu, Suxiu
    Lu, Qiang
    [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 1765 - 1769
  • [29] Cost-benefit analysis: economic evaluation of policies and projects
    不详
    [J]. INVESTIGACIONES REGIONALES, 2009, (14): : 227 - 227
  • [30] OPTIMIZING COST IN SOFTWARE DEVELOPMENT PROJECTS
    Gonsalves, Tad
    Kawabata, Ryo
    Itoh, Kiyoshi
    [J]. JOURNAL OF INTEGRATED DESIGN & PROCESS SCIENCE, 2009, 13 (04) : 35 - 44