The Cost of Speed: Work Policies for Crashing and Overlapping in Product Development Projects

被引:24
|
作者
Meier, Christoph [1 ]
Browning, Tyson R. [2 ]
Yassine, Ali A. [3 ]
Walter, Ulrich [1 ]
机构
[1] Tech Univ Munich, Inst Aeronaut, D-85748 Munich, Germany
[2] Texas Christian Univ, Neeley Sch Business, Ft Worth, TX 76129 USA
[3] Amer Univ Beirut, Dept Engn Management, Beirut 11072020, Lebanon
关键词
Crashing; iteration; overlapping; product development (PD); project management; time-cost tradeoffs; work policy; HEURISTIC RULES PERFORMANCE; DESIGN PROCESS; CYCLE TIME; INFORMATION; NETWORK; MODEL; MANAGEMENT; FRAMEWORK; SIMULATION; INNOVATION;
D O I
10.1109/TEM.2015.2411514
中图分类号
F [经济];
学科分类号
02 ;
摘要
Project management theory provides insufficient insight on the effects of crashing and overlapping in product development (PD) projects. The scholarly literature largely assumes that networks of project activities are acyclical. PD projects are iterative, however, and the time-cost implications of managerial actions, such as activity crashing and overlapping, differ in this context. We build a rich model that accounts for activity overlapping, crashing, and iteration in the project's activity network. Using a bank of thousands of artificial but realistic test problems, we test the performance of several alternative work policies-managerial rules about when to start work and rework, and when to allow crashing and overlapping-and compare their time-cost implications. We find that the time-cost benefits of crashing and overlapping increase with increasing iteration. However, whereas crashing works well in combination with an aggressive work policy that does not seek to minimize iteration and rework, overlapping ironically works better with a work policy that defers rework. No single work policy dominates in all situations, although an aggressive policy that precipitates rework may often be worth its added cost. We distill our findings into a set of propositions that pave the way for further theory development in this area. Our results also illuminate useful heuristics for managers of PD projects.
引用
收藏
页码:237 / 255
页数:19
相关论文
共 50 条
  • [1] Concurrent crashing and overlapping in product development
    Roemer, TA
    Ahmadi, R
    [J]. OPERATIONS RESEARCH, 2004, 52 (04) : 606 - 622
  • [2] Overlapping and communication policies in product development
    Lin, Jun
    Qian, Yanjun
    Cui, Wentian
    Miao, Zhanli
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 201 (03) : 737 - 750
  • [3] The impact of uncertainty and ambiguity related to iteration and overlapping on schedule of product development projects
    Yang, Qing
    Lu, Ting
    Yao, Tao
    Zhang, Bo
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 827 - 837
  • [4] An intelligent model for cost prediction in new product development projects
    Mousavi, S. Meysam
    Vahdani, Behnam
    Abdollahzade, Majid
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 29 (05) : 2047 - 2057
  • [5] The balance of cost, quality and speed in new product development
    Tao, Lv
    [J]. Proceedings of 2005 International Conference on Innovation & Management, 2005, : 934 - 937
  • [6] Decision-making and cost deviation in new product development projects
    Olsson, Anne-Cathrine Thore
    Johannesson, Ulf
    Schweizer, Roger
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2018, 11 (04) : 1066 - 1085
  • [7] Estimating the Costs of Product Development Projects Based on External Data: The New Product Development Cost Benchmarking Method
    Disch, Michael
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2023, : 5117 - 5128
  • [8] An overlapping-based process model for managing schedule and cost risk in product development
    Yang, Qing
    Zhang, Xiaofeng
    Yao, Tao
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2012, 20 (01): : 3 - 17
  • [9] Estimating time and cost for policies and procedures projects
    Escoe, A
    [J]. STC'S 50TH ANNUAL CONFERENCE, PROCEEDINGS, 2003, : 24 - 25
  • [10] Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: a case study of Huoshengshan and Leishenshan Hospital projects in Wuhan
    Lu, Hui
    Wang, Hongwei
    Yu, Dihua
    Ye, Jian
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (08) : 3696 - 3712