共 38 条
- [31] PROJECT COST ESTIMATE AT COMPLETION: EARNED VALUE MANAGEMENT VERSUS EARNED SCHEDULE-BASED REGRESSION MODELS. A COMPARATIVE ANALYSIS OF THE MODELS APPLICATION IN THE CONSTRUCTION PROJECTS IN ROMANIA ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2018, 52 (03): : 205 - 216
- [34] Computer-aided system of construction and analysis of empirical mathematical models of the interrelation between parameters of synthetic diamond powder properties Sverkhtverdye Materialy, 2000, (01): : 95 - 99
- [36] Analysis of Breakthrough Curve Performance Using Theoretical and Empirical Models: Hg2+ Removal by Bone Char from Synthetic and Real Water Arabian Journal for Science and Engineering, 2023, 48 : 8737 - 8751
- [38] Can the construction of a high-speed rail alleviate haze pollution: an empirical analysis based on social networks and dynamic spatial econometric models Environmental Science and Pollution Research, 2024, 31 : 14990 - 15006