共 50 条
- [41] Estimation of power battery SOC based on PSO-Elman neural network [J]. 2018 CHINESE AUTOMATION CONGRESS (CAC), 2018, : 91 - 96
- [42] Risk Management in Highway Construction Project Based on Integrated Project Management System [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 146 - +
- [43] Research on Risk Management Organization of Subway Construction Project Based on Social Network Analysis [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT, EDUCATION, HUMANITIES AND SOCIAL SCIENCES (EMEHSS 2018), 2018, 151 : 464 - 468
- [44] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
- [46] Model of Investment Risk Prediction Based on Neural Network and Data Mining Technique for Construction Project [J]. PROCEEDINGS OF THE 2008 INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN, VOL 1, 2008, : 373 - 378
- [47] Integrating real options into project management process of power plant construction [J]. PROCEEDINGS OF 2003 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2003, : 2264 - 2271
- [48] Forecasting construction project cost based on BP neural network [J]. 2018 10TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA), 2018, : 420 - 423
- [49] A modified Elman neural network-based power controller in mobile communications systems [J]. Soft Computing, 2005, 9 : 88 - 93