Failure Mechanism of Primary Support for a Shallow and Asymmetrically Loaded Tunnel Portal and Treatment Measures

被引:32
|
作者
Yang, Chao [1 ]
Hu, Zhangxin [1 ]
Huang, Da [2 ]
Guo, Fei [3 ]
机构
[1] China Three Gorges Univ, Key Lab Geol Hazards Three Gorges Reservoir Area, Minist Educ, Yichang 443002, Peoples R China
[2] Hebei Univ Technol, Sch Civil & Transportat Engn, Tianjin 300401, Peoples R China
[3] China Three Gorges Univ, Hubei Key Lab Disaster Prevent & Mitigat, Yichang 443002, Peoples R China
基金
中国国家自然科学基金;
关键词
Shallow and asymmetrically loaded tunnel; Primary support; Failure mechanism; Treatment measures; MODEL TEST; SURROUNDING ROCK; BIAS TUNNELS; INVESTIGATE; PRESSURE;
D O I
10.1061/(ASCE)CF.1943-5509.0001385
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Shallow and asymmetrically loaded tunnels are very common in mountain tunnel portals, and localized excessive deformation, cracking, or even collapse often occur during the construction process. In this study, a shallow and asymmetrically loaded tunnel entrance is used as an example to discuss the primary support failure mechanism by means of field observations and monitoring and three-dimensional (3D) numerical simulation. Asymmetrical loading, rainfall, and mismanagement were the three main triggers of failure events. The continuous rainfall infiltration significantly reduced the quality of the surrounding rock, resulting in an increase in the initially high asymmetrical loading. The retaining wall and surrounding rock failed to provide sufficient counterpressure on the shallowly buried side, leading to large deformation of the primary support at the beginning of excavation. The deformation increased continuously and quickly exceeded the allowable value; however, the project was not stopped in time, and further excavation occurred due to a communication failure between the monitoring and construction crews. Thus, severe damage to the primary support occurred when the tunnel face reached a distance of 24 m from the entrance. To avoid more hazardous damage, a temporary support mainly composed of 20b I-steel was installed immediately to prevent deformation; 30 days later, a cutting slope was created on the deeply buried side to reduce the asymmetrical loading, and the excavated rock mass was stacked at the shallow buried side to increase the counterpressure. Then, the temporary support was removed, and a secondary lining was applied in a timely fashion. The monitoring data showed that good results had been achieved. This study provides useful recommendations for the construction safety of shallow and asymmetrically loaded tunnel portals. (C) 2019 American Society of Civil Engineers.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Failure mechanism and treatment measures of supporting structures at the portal for a shallow buried and asymmetrically loaded tunnel with small clear-distance
    Chen, Hao
    Lai, Hongpeng
    Huang, Man
    Wang, Gang
    Tang, Qiang
    NATURAL HAZARDS, 2022, 114 (02) : 2283 - 2310
  • [2] Failure mechanism and treatment measures of supporting structures at the portal for a shallow buried and asymmetrically loaded tunnel with small clear-distance
    Hao Chen
    Hongpeng Lai
    Man Huang
    Gang Wang
    Qiang Tang
    Natural Hazards, 2022, 114 : 2283 - 2310
  • [3] Cracking mechanism of secondary lining for a shallow and asymmetrically-loaded tunnel in loose deposits
    Xiao, J. Z.
    Dai, F. C.
    Wei, Y. Q.
    Min, H.
    Xu, Chong
    Tu, X. B.
    Wang, M. L.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 43 : 232 - 240
  • [4] Effects of Portal Failure on Tunnel Support Systems in a Highway Tunnel
    E. B. Aygar
    C. Gokceoglu
    Geotechnical and Geological Engineering, 2021, 39 : 5707 - 5726
  • [5] Effects of Portal Failure on Tunnel Support Systems in a Highway Tunnel
    Aygar, E. B.
    Gokceoglu, C.
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (08) : 5707 - 5726
  • [6] Collapse mechanism and support pressure for shallow tunnel face
    Yang, Feng
    Yang, Jun-Sheng
    Zhao, Lian-Heng
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (02): : 279 - 284
  • [7] Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel
    Hu, Guoping
    Xia, Yingzhi
    Zhong, Lianggen
    Ruan, Xiaoxue
    Li, Hui
    GEOMECHANICS AND ENGINEERING, 2023, 32 (01) : 111 - 123
  • [8] Research on Collapse Mechanism of Tunnel Portal Shallow Burying Segment of Center Diaphragm Construction Method and Its Treatment
    Zhou, Fei
    Xie, Yongli
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1435 - 1440
  • [9] Support Measures to Prevent the Deformation and Failure of a Carbonaceous Mudstone Tunnel
    Wang, Yongdong
    Jiang, Haitao
    Yan, Xin
    Liang, Huiru
    Li, Guoan
    Liu, Xiao
    Peng, Hao
    Wan, Shantong
    Bai, Wenjun
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [10] Analysis of the contribution of face support and primary support to the surface settlement control of shallow tunnel
    Gao, Wenshan
    Wang, Lichuan
    Zhang, Huijian
    Zhang, Lela
    Zhao, Wei
    Hou, Feng
    Zhang, Huijian (huijianz@163.com), 1600, Central South University Press (18): : 720 - 727