共 50 条
- [1] Innovative concrete overlays for bridge-deck rehabilitation in Montreal [J]. CONCRETE REPAIR, REHABILITATION AND RETROFITTING II, 2009, : 351 - +
- [2] Innovative continuous prestressed concrete bridge deck sub-panel [J]. INNOVATION IN CIVIL AND STRUCTURAL ENGINEERING, 1997, : 259 - 273
- [3] Field and laboratory evaluation of silica fume modified concrete bridge deck overlays in Ohio [J]. CONCRETE IN CONSTRUCTION, 1998, (1610): : 20 - 27
- [4] On-site Evaluation of Fatigue Damage in Concrete Bridge Deck with Innovative NDT [J]. STRUCTURAL HEALTH MONITORING 2015: SYSTEM RELIABILITY FOR VERIFICATION AND IMPLEMENTATION, VOLS. 1 AND 2, 2015, : 2583 - 2590
- [5] PRECAST CONCRETE DECK MODULES FOR BRIDGE DECK RECONSTRUCTION [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1983, 28 (04): : 120 - 135
- [6] Ohio bridge deck replacement advances use of FRP [J]. CIVIL ENGINEERING, 2001, 71 (02): : 34 - 34
- [7] FRP deck system used for the Columbus bridge in Ohio [J]. ADVANCING AFFORDABLE MATERIALS TECHNOLOGY, 2001, 33 : 848 - 854
- [8] Innovative application of concrete deck posttensioning [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN CONCRETE TECHNOLOGY, 2007, : 51 - 58
- [9] Cracking Tendency of Bridge Deck Concrete [J]. TRANSPORTATION RESEARCH RECORD, 2010, (2164) : 122 - 131
- [10] Conductive concrete overlay for bridge deck deicing [J]. ACI MATERIALS JOURNAL, 1999, 96 (03) : 382 - 390