Determining Interconnectedness of Barriers to Interface Management in Large Construction Projects

被引:9
|
作者
Malla, Vijayeta [1 ,2 ]
Delhi, Venkata Santosh Kumar [3 ]
机构
[1] Indian Inst Technol, Hyderabad 500101, India
[2] Natl Inst Construct Management & Res NICMAR, Sch Construct Management, Hyderabad 500101, India
[3] Indian Inst Technol, Dept Civil Engn, Mumbai 400076, Maharashtra, India
来源
CONSTRUCTION ECONOMICS AND BUILDING | 2022年 / 22卷 / 02期
关键词
Interface Management; Interface Issues; Project Management; Interpretive Structural Modelling; Large Infrastructure Construction Projects; DESIGN; PERFORMANCE; IMPACT; DELAY; TIME; ISM; TECHNOLOGIES;
D O I
10.5130/AJCEB.v22i2.7936
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study aims to identify the crucial barriers to interface management and understand the interdependencies in Large Infrastructure Construction Projects (LICP). Three-pronged sequential explanatory mixed methods research is adopted comprising a structured survey of experts (n=102) and semi-structured interviews (n=13). Subsequently, interpretive structural modelling (ISM) integrated with fuzzy protocol is used to analyse pairwise interrelationships among these factors. A 'Multi-layered IM barrier' model is developed with 'Process related issues,' Misatigned incentives among project stakeholders' and 'Frequent Change Orders' as the manifested barriers. On the other hand, this study also prioritized the barriers and classified them as driving, linking, and independent. The outcome of this study presents the interdependence of barriers and classification of barriers, focusing on proactive action on driving barriers, which is crucial to the knowledge of interface management. The impact position of LICP with the identified project issues can be compared against 'Multi-layered IM barriers' and can help project teams better strategize IM by focusing on essential barriers. In addition, such exercises can improve the coordination among participants in construction projects. Using a structured approach to identifying interdependencies among barriers to IM is a significant original contribution by the study.
引用
收藏
页码:69 / 101
页数:33
相关论文
共 50 条
  • [31] Measuring the maturity of risk management in large-scale construction projects
    Jia, Guangshe
    Ni, Xiaochuan
    Chen, Zhen
    Hong, Baonan
    Chen, Yuting
    Yang, Fangjun
    Lin, Chen
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 34 : 56 - 66
  • [32] Owner Oriented Integration Management of Large General Hospital Construction Projects
    Pang, Yu-cheng
    Shi, Li
    [J]. PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: INNOVATION AND PRACTICE IN INDUSTRIAL ENGINEERING AND MANAGEMENT (VOL 2), 2016, : 317 - 325
  • [33] Dynamic conflict management in large-scale design and construction projects
    Ng, Helen S.
    Pena-Mora, Feniosky
    Tamaki, Tadatsugu
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2007, 23 (02) : 52 - 66
  • [34] Risk management in the design phase of large-scale construction projects
    El-Dash, Karim
    Abd-Raboh, Emad
    El-Dars, Zakariya
    [J]. Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 263 - 269
  • [35] Emergency Management of Large-Scale Construction Projects Based on Metadata
    Xu, Shengdeng
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION, VOL 2: INNOVATION AND PRACTICE OF INDUSTRIAL ENGINEERING AND MANAGMENT, 2016, : 865 - 875
  • [36] Enablers and Barriers of Lean Implementation in Construction Projects
    Bayhan, Hasan Gokberk
    Demirkesen, Sevilay
    Jayamanne, Eshan
    [J]. 3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
  • [37] Exploratory Study on the Effectiveness of Interface-Management Practices in Dealing with Project Complexity in Large-Scale Engineering and Construction Projects
    Ahn, Seungjun
    Shokri, Samin
    Lee, SangHyun
    Haas, Carl T.
    Haas, Ralph C. G.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (02)
  • [38] Construction Schedule Management System for Large-Scale Construction Projects Based on Multisensor Network
    Meng, Fanmin
    Yu, Shaozhi
    Xue, Jianying
    [J]. COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [39] Determining priorities for managing risk on construction projects
    Ceric, Anita
    Maric, Tamara
    [J]. GRADEVINAR, 2011, 63 (03): : 265 - 271
  • [40] MANAGEMENT OF LARGE PROJECTS
    HAMMILL, J
    SALLABANK, LCT
    KELLY, PB
    [J]. IEE PROCEEDINGS-A-SCIENCE MEASUREMENT AND TECHNOLOGY, 1990, 137 (01): : 55 - 55