A hybrid risk prioritization approach in construction projects using failure mode and effective analysis

被引:23
|
作者
Karamoozian, Amirhossein [1 ]
Wu, Desheng [1 ,2 ]
机构
[1] Univ Chinese Acad Sci, Sch Econ & Management, Beijing, Peoples R China
[2] Stockholm Univ, Stockholm Business Sch, Stockholm, Sweden
基金
中国国家自然科学基金;
关键词
Risk prioritization; Fuzzy FMEA; FDEMATEL; ANP; Construction projects; GROUP DECISION-MAKING; INTEGRATED DEMATEL; FMEA; SELECTION; ANP; MANAGEMENT; FRAMEWORK;
D O I
10.1108/ECAM-10-2019-0535
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Construction projects involve with various risks during all phases of project lifecycle. Failure mode and effective analysis (FMEA) is a useful tool for identifying and eliminating possible risk of failure modes (FMs) and improving the reliability and safety of systems in a broad range of industries. The traditional FMEA method applies risk priority number method (RPN) to calculate risk of FMs. RPN method cannot consider the direct and indirect interdependencies between the FMs and is not appropriate for complex system with numerous components. The purpose of this study is to propose an approach to consider interdependencies between FMs and also using fuzzy theory to consider uncertainties in experts' judgments. Design/methodology/approach The proposed approach consist of three stages: the first stage of hybrid model used fuzzy FMEA method to identify the failure mode risks and derive the RPN values. The second stage applied Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL) method to determine the interdependencies between the FMs which are defined through fuzzy FMEA. Then, analytic network process (ANP) is applied in the third stage to calculate the weights of FMs based on the interdependencies that are generated through FDEMATEL method. Finally, weight of FMs through fuzzy FMEA and FDEMATEL-ANP are multiplied to generate the final weights for prioritization. Afterward, a case study for a commercial building project is introduced to illustrate proficiency of model. Findings The results showed that the suggested approach could reveal the important FMs and specify the interdependencies between them successfully. Overall, the suggested model can be considered as an efficient hybrid FMEA approach for risk prioritization. Originality/value The originality of approach comes from its ability to consider interdependencies between FMs and uncertainties of experts' judgments.
引用
收藏
页码:2661 / 2686
页数:26
相关论文
共 50 条
  • [1] Identification and prioritization of construction projects investment risks using a hybrid fuzzy approach
    Gharanfoli, Bardeya
    Valmohammadi, Changiz
    [J]. JOURNAL OF MULTI-CRITERIA DECISION ANALYSIS, 2019, 26 (3-4) : 113 - 127
  • [2] Risk Evaluation and Prioritization in Bridge Construction Projects Using System Dynamics Approach
    Mortazavi, Seyedmehdi
    Kheyroddin, Ali
    Naderpour, Hosein
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2020, 25 (03)
  • [3] Risk-Based Prioritization Approach to Construction Inspections for Transportation Projects
    Mohamad, Mamdouh
    Tran, Dai Q.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (01)
  • [4] Risk prioritization in failure mode and effects analysis under uncertainty
    Zhang, Zaifang
    Chu, Xuening
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (01) : 206 - 214
  • [5] A new risk prioritization model for failure mode and effects analysis
    Anes, V.
    Henriques, E.
    Freitas, M.
    Reis, L.
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2018, 34 (04) : 516 - 528
  • [6] Case study of a Risk Prioritization in Failure Mode Effects and Critical Analysis Using MCDM
    Kahouadji, Housseyn
    Belkaid, Faycal
    [J]. 2022 14TH INTERNATIONAL COLLOQUIUM OF LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA2022), 2022, : 438 - 443
  • [7] An Approach for Risk Prioritization in Construction Projects Using Analytic Network Process and Decision Making Trial and Evaluation Laboratory
    Karamoozian, Amirhossein
    Wu, Desheng
    Chen, C. L. Philip
    Luo, Cuicui
    [J]. IEEE ACCESS, 2019, 7 : 159842 - 159854
  • [8] A linguistic risk prioritization approach for failure mode and effects analysis: A case study of medical product development
    Wang, Liang
    Hu, Yu-Ping
    Liu, Hu-Chen
    Shi, Hua
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2019, 35 (06) : 1735 - 1752
  • [9] A New Approach to Analysis of Green Risk in Construction Projects
    Zhang, Xian-feng
    Li, Hui-qiang
    He, Yong-fang
    Liu, Hai-liang
    [J]. EIGHTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2009, : 2248 - 2253
  • [10] Automated prioritization of construction project requirements using machine learning and fuzzy Failure Mode and Effects Analysis (FMEA)
    ul Hassan, Fahad
    Nguyen, Thinh
    Le, Tuyen
    Le, Chau
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 154