共 33 条
Software management and implementation plan for the Microwave Limb Sounder (MLS) carried on a NASA satellite
被引:0
|作者:
Shaw, HY
[1
]
Sherif, JS
[1
]
Girard, M
[1
]
Perun, V
[1
]
机构:
[1] CALTECH, Jet Prop Lab, Pasadena, CA 91109 USA
关键词:
software management plan;
Microwave Limb Sounder;
work implementation plan;
flight development phases;
D O I:
暂无
中图分类号:
TP [自动化技术、计算机技术];
学科分类号:
0812 ;
摘要:
This paper presents a Software Management and Implementation Plan (SMIP) for managing and controlling the development of the Microwave Limb Sounder (MLS) instrument software, and the Instrument Ground Support Equipment (IGSE) software. The paper is intended to be a combination of the Software Management Plan (SMP) and the Work Implementation Plan (WIP). It describes the management approach to developing the instrument software and the IGSE software which is used to test the instrument and its software. This includes the flight development phases, flight software activities, life cycle, deliverables, and other software development process issues such as configuration management practices, software assurance activities, risk management and metrics reporting. The project was completed at the Jet Propulsion Laboratory (JPL).
引用
收藏
页码:311 / 315
页数:5
相关论文