Dynamic Design and Simulation Analysis of 1000MW Large Turbo-Generator

被引:6
|
作者
Wang Yixuan [1 ]
Wang Ying [2 ]
Qu Haifei [1 ]
Liu Xin [1 ]
机构
[1] Xian Polytech Univ, Dept Mech Engn, Xian 710048, Shaanxi, Peoples R China
[2] Natl Univ Singapore, Sch Comp, Singapore, Singapore
关键词
Large turbo-generator; electromagnetic design; finite element method; dynamic simulation; optimization design;
D O I
10.1109/ICMA.2009.5246294
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Through a great deal calculation, the parametric design and simulation analysis of stator and rotor electromagnetic system of 1000MW turbo-generator are performed by using Ansoft Maxwell Rmxprt12.1 software. Besides, the basic parameters of the generator, the geometry dimensions of the stator and rotor, type and sizes of the slots, coils and windings parameters and the way of windings connection are determined. The finite element model of electromagnetic systems of generator stator and rotor is constructed by Ansoft Maxwell2D3D 12.1, and the transient electromagnetic characteristics of generator is analyzed and simulated. The 3D geometric models of turbo-generator are established respectively by using PROE software, and the dynamic finite element model of generator structure is built by ANSYS workbench 11.0. In addition, the dynamic characteristics of stator iron core, stator frame are calculated respectively. The simulation calculation has shown that the structural parameters, material parameters, and the electromagnetic characteristics parameters for large turbo-generator that are put forward by this paper should be optimal,the design plan and method suggested by this paper should be feasible. The paper provides an effective solution for the development of larger turbogenerator than 1000MW.
引用
收藏
页码:1650 / +
页数:2
相关论文
共 50 条
  • [1] Calculation and analysis of the bearing load sensitivity of a 1000 MW turbo-generator unit
    Tian, Yong-Wei
    Yang, Jian-Gang
    [J]. Reneng Dongli Gongcheng/Journal of Engineering for Thermal Energy and Power, 2008, 23 (05): : 459 - 461
  • [2] TURBO-GENERATOR FOUNDATION DYNAMIC ANALYSIS
    Bencat, J.
    Lukac, M.
    [J]. ENGINEERING MECHANICS 2018 PROCEEDINGS, VOL 24, 2018, : 73 - 76
  • [3] DYNAMIC STUDIES OF 200 MW TURBO-GENERATOR FOUNDATION.
    Wedpathak, A.V.
    Pandit, V.K.
    Bhandwalkar, P.K.
    Guha, S.K.
    [J]. Journal of the Institute of Wood Science, 1978, 1 : 181 - 186
  • [4] ROTOR DESIGN OF A 1000MW SUPERCONDUCTING GENERATOR
    YAMAGUCHI, K
    MAKI, N
    SHIOBARA, R
    [J]. IEEE TRANSACTIONS ON ENERGY CONVERSION, 1989, 4 (02) : 244 - 249
  • [5] Thermal Analysis of 1000-MW Supercritical Turbo-Generator Under Hollow Strands Blocking
    Guan, Chunwei
    Li, Weili
    Huo, Feiyang
    Zheng, Ping
    [J]. HEAT TRANSFER ENGINEERING, 2013, 34 (07) : 642 - 652
  • [6] Microcomputerized simulation of dynamic balancing of turbo-generator set
    Ju, Yanzhong
    Chen, Jianhua
    Han, Yucai
    [J]. Zhongguo Dianli/Electric Power, 2000, 33 (03): : 17 - 19
  • [7] Design of Large Synchronous Turbo-Generator Monitoring System
    Kovacic, Marinko
    Hanic, Zlatko
    Vrazic, Mario
    [J]. 2012 XXTH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES (ICEM), 2012, : 1631 - 1636
  • [8] Vibration analysis of large turbo-generator stator system
    Qing, GH
    Qiu, JJ
    Hu, YD
    [J]. POWERCON 2002: INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY, VOLS 1-4, PROCEEDINGS, 2002, : 2168 - 2172
  • [9] Failure analysis of turbo-generator of a 10 MW captive power plant
    Parida, N
    Tarafder, S
    [J]. ENGINEERING FAILURE ANALYSIS, 2001, 8 (03) : 303 - 309
  • [10] DESIGN OF TURBO-GENERATOR JOURNAL BEARINGS
    TOKAR, IY
    [J]. RUSSIAN ENGINEERING JOURNAL-USSR, 1969, 49 (05): : 16 - &