共 50 条
- [1] Real-time master-based feedrate scheduling with kinematic constraints for five-axis machining [J]. The International Journal of Advanced Manufacturing Technology, 2022, 123 : 493 - 510
- [2] Real-time master-based feedrate scheduling with kinematic constraints for five-axis machining [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2022, 123 (1-2): : 493 - 510
- [3] An improved feedrate scheduling method for NURBS interpolation in five-axis machining [J]. PRECISION ENGINEERING-JOURNAL OF THE INTERNATIONAL SOCIETIES FOR PRECISION ENGINEERING AND NANOTECHNOLOGY, 2020, 64 : 70 - 90
- [8] Jerk-limited feedrate scheduling and optimization for five-axis machining using new piecewise linear programming approach [J]. Science China Technological Sciences, 2019, 62 : 1067 - 1081
- [9] An adaptive feedrate scheduling method of dual NURBS curve interpolator for precision five-axis CNC machining [J]. The International Journal of Advanced Manufacturing Technology, 2013, 68 : 1977 - 1987
- [10] An adaptive feedrate scheduling method of dual NURBS curve interpolator for precision five-axis CNC machining [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12): : 1977 - 1987