Holistic Framework for Highway Construction Cost Index Development Based on Inconsistent Pay Items

被引:3
|
作者
Liu, Hexu [1 ]
Kwigizile, Valerian [1 ]
Huang, Wei-Chiao [2 ]
机构
[1] Western Michigan Univ, Dept Civil & Construct Engn, Kalamazoo, MI 49008 USA
[2] Western Michigan Univ, Dept Econ, Kalamazoo, MI 49008 USA
关键词
Highway construction; Cost estimating; Price index; Construction market condition; Data analytic; Inconsistent pay items; Unbalanced bid prices;
D O I
10.1061/(ASCE)CO.1943-7862.0002080
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A construction cost index (CCI) measures the price changes of construction items over time. It allows owner agencies and contractors to monitor construction market fluctuations so that they can more accurately estimate construction costs and project long-term funding needs. However, various CCI calculation methods in the highway construction industry are limited in two respects: (1) inability to account for inconsistent pay items, primarily caused by changes in pay item catalogs, and (2) insufficiency in statistically cleaning pay item data, e.g., unbalanced bid prices. For this reason, the resulting highway construction cost index (HCCI) cannot accurately reflect the construction market. To address such limitations, this research develops a three-step holistic framework for automated HCCI development using inconsistent pay items. The three-step methodology encompasses (1) data cleaning, where a text analysis algorithm and outlier detection algorithms are developed to clean inconsistent pay items and unbalanced bid prices; (2) pay item sampling, which helps to select and edit pay items through various statistical analysis; and (3) HCCI calculation, where the chained Fisher index formula is applied to calculate HCCIs at the state level, as well as indexes for specific regions and item categories. A prototype application is developed to generate quarterly and annual HCCIs automatically using the Python programming language. Ten-year data, i.e., 251,033 records, were used to verify and validate the prototyped system. The resulting HCCI and sub-HCCIs provide reliable insights into construction market conditions with high granularity. This research contributes to the body of knowledge by offering a holistic framework for automated HCCI development that leverages the text analysis algorithm for accounting for inconsistent pay items and two-stage outlier treatments for cleaning pay item data.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Adaptability Evaluation Index System Construction between Highway Construction and Regional Socio-economic Development-Taking Heilongjiang Province as an Example
    Hua, Rui
    PROGRESS IN ENVIRONMENTAL PROTECTION AND PROCESSING OF RESOURCE, PTS 1-4, 2013, 295-298 : 2469 - 2474
  • [42] TOWARDS THE DEVELOPMENT OF A GLOBAL INDEX OF FUNCTIONAL DISABILITY BASED ON THE OECD QUESTIONNAIRE - ITEMS IN A SWISS SURVEY
    RAYMOND, L
    CHRISTE, E
    CLEMENCE, A
    REVUE D EPIDEMIOLOGIE ET DE SANTE PUBLIQUE, 1981, 29 (04): : 451 - 459
  • [43] A holistic framework for development and assessment of risk-informed performance-based building regulation
    Meacham, Brian J.
    Stromgren, Michael
    van Hees, Patrick
    FIRE AND MATERIALS, 2021, 45 (06) : 757 - 771
  • [44] A fuel-based approach for emission factor development for highway paving construction equipment in China
    Li, Zhen
    Zhang, Kaishan
    Pang, Kaili
    Di, Baofeng
    JOURNAL OF THE AIR & WASTE MANAGEMENT ASSOCIATION, 2016, 66 (12) : 1214 - 1223
  • [45] A Holistic Conceptual Framework into Practice-Based on Urban Tourism Toward Sustainable Development in Thailand
    Koodsela, Wannipa
    Dong, Huang
    Sukpatch, Kassara
    SUSTAINABILITY, 2019, 11 (24)
  • [46] Prediction of construction cost index based on multi variable grey neural network model
    Xie S.
    Fang J.
    Xie, Shasha (130531011@qq.com), 2018, Inderscience Publishers, 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (10) : 209 - 226
  • [47] CARMI: A Cache-Aware Learned Index with a Cost-based Construction Algorithm
    Zhang, Jiaoyi
    Gao, Yihan
    PROCEEDINGS OF THE VLDB ENDOWMENT, 2022, 15 (11): : 2679 - 2691
  • [48] Developing a cost normalization framework for phase-based performance assessment of construction projects
    Choi, Jiyong
    Yun, Sungmin
    de Oliveira, Daniel P.
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2016, 43 (12) : 1075 - 1086
  • [49] DEVELOPMENT AND VALIDATION OF A HIGH COST NEED-BASED INDEX FOR WAIVER CLIENT COST PREDICTION
    Oberst, K.
    An, H.
    Given, C. W.
    GERONTOLOGIST, 2014, 54 : 115 - 115
  • [50] Development of Elderly Quality of Life Index-EQoLI: Theoretical-conceptual framework, chosen methodology, and relevant items generation
    Pacheco Paschoal, Sergio Marcio
    Jacob Filho, Wilson
    Litvoc, Julio
    CLINICS, 2007, 62 (03) : 279 - 288