Excessive groundwater inflow during TBM tunneling in limestone formation

被引:11
|
作者
Lee, Sungjune [1 ]
Moon, Joon-Shik [2 ]
机构
[1] Cheongju Univ, Div Human Environm Design, Dept Civil Engn, Cheongju 28503, South Korea
[2] Kyungpook Natl Univ, Dept Civil Engn, 80 Daehak Ro, Daegu 41566, South Korea
基金
新加坡国家研究基金会;
关键词
Groundwater inflow; Ground subsidence; Limestone; Cavity; EPBM; 3-D numerical analysis; Back-analysis; CONSTRUCTION; EXCAVATION;
D O I
10.1016/j.tust.2019.103217
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A sudden increase of groundwater inflow of 670 tons a day was experienced during tunneling in a limestone formation at around 53 m below the ground surface. The limestone cavities were expected to be located at 5-10 m or more above the tunnel crown in geotechnical exploration. However, limestone cavity network was encountered at the tunnel depth, and large groundwater inflow was experienced. Because of the excessive groundwater inflow into the tunnel, the groundwater level dropped to GL-32 m from the original level of GL-16 m, and consequently maximum of 23 mm of ground settlement and damage of adjacent structures took place. In this study the change of groundwater regime during tunneling in limestone area containing cavity network was analyzed through 3-dimensional numerical analysis, and the mechanism of groundwater level drawdown followed by ground subsidence was analyzed by comparing measurements and numerical analysis results. And also the analytical solution for determining the range of cutoff grouting was proposed to minimize groundwater inflow during excavation in a fractured zone.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Analysis on the Evolution of Rock Block Behavior During TBM Tunneling Considering the TBM-Block Interaction (vol 51, pg 2237, 2018)
    Zhang, Zixin
    Wang, Shuaifeng
    Huang, Xin
    ROCK MECHANICS AND ROCK ENGINEERING, 2018, 51 (07) : 2317 - 2319
  • [42] Minimize scale formation during groundwater treatment
    DeGiorgio, RJ
    CHEMICAL ENGINEERING, 1998, 105 (12) : 135 - +
  • [43] Minimize scale formation during groundwater treatment
    DeGiorgio, Robert J.
    Chemical Engineering (New York), 1998, 105 (12):
  • [44] Water Inflow Prediction during Heavy Rain While Tunneling through Karst Fissured Zones
    Lin, P.
    Li, S. C.
    Xu, Z. H.
    Wang, J.
    Huang, X.
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2019, 19 (08)
  • [45] ELIMINATION OF EXCESSIVE CARBON FORMATION DURING CATALYTIC BUTENE DEHYDROGENATION
    SWIFT, HE
    BEUTHER, H
    RENNARD, RJ
    INDUSTRIAL & ENGINEERING CHEMISTRY PRODUCT RESEARCH AND DEVELOPMENT, 1976, 15 (02): : 131 - 139
  • [46] Formation of the Electron Inflow Along the Separatrices During Collisionless Magnetic Reconnection
    Nan, Jia
    Huang, Kai
    Lu, Quanming
    Lu, San
    Wang, Rongsheng
    Xie, Jinlin
    Zheng, Jian
    Wang, Shui
    JOURNAL OF GEOPHYSICAL RESEARCH-SPACE PHYSICS, 2022, 127 (05)
  • [47] PHASE FORMATION AND STRUCTURE FORMATION IN LIMESTONE-KAOLINITE DISPERSIONS DURING HYDROTHERMAL HEATING
    GOVOROV, AA
    OVCHARENKO, FD
    DZHUS, EV
    BAKUSHINA, NV
    DOKLADY AKADEMII NAUK SSSR, 1978, 240 (02): : 384 - 386
  • [48] Microseismic Monitoring of Energy Changes in Deep Tunnels during the TBM Tunneling of the Jinping II Hydropower Station
    Zhuang, Duanyang
    Ma, Ke
    Tang, Chunan
    Liang, Zhengzhao
    Wang, Zhenwei
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [49] Intelligent Prediction of Multi-Factor-Oriented Ground Settlement During TBM Tunneling in Soft Soil
    Ding, Zhi
    Zhao, Lin-Shuang
    Zhou, Wan-Huan
    Bezuijen, Adam
    FRONTIERS IN BUILT ENVIRONMENT, 2022, 8
  • [50] Bromate formation during ozonation of groundwater in coastal areas
    Tyrovola, K
    Diamadopoulos, E
    PROTECTION AND RESTORATION OF THE ENVIRONMENT VI, VOLS I - III, PROCEEDINGS, 2002, : 65 - 72