Excessive groundwater inflow during TBM tunneling in limestone formation

被引:11
|
作者
Lee, Sungjune [1 ]
Moon, Joon-Shik [2 ]
机构
[1] Cheongju Univ, Div Human Environm Design, Dept Civil Engn, Cheongju 28503, South Korea
[2] Kyungpook Natl Univ, Dept Civil Engn, 80 Daehak Ro, Daegu 41566, South Korea
基金
新加坡国家研究基金会;
关键词
Groundwater inflow; Ground subsidence; Limestone; Cavity; EPBM; 3-D numerical analysis; Back-analysis; CONSTRUCTION; EXCAVATION;
D O I
10.1016/j.tust.2019.103217
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A sudden increase of groundwater inflow of 670 tons a day was experienced during tunneling in a limestone formation at around 53 m below the ground surface. The limestone cavities were expected to be located at 5-10 m or more above the tunnel crown in geotechnical exploration. However, limestone cavity network was encountered at the tunnel depth, and large groundwater inflow was experienced. Because of the excessive groundwater inflow into the tunnel, the groundwater level dropped to GL-32 m from the original level of GL-16 m, and consequently maximum of 23 mm of ground settlement and damage of adjacent structures took place. In this study the change of groundwater regime during tunneling in limestone area containing cavity network was analyzed through 3-dimensional numerical analysis, and the mechanism of groundwater level drawdown followed by ground subsidence was analyzed by comparing measurements and numerical analysis results. And also the analytical solution for determining the range of cutoff grouting was proposed to minimize groundwater inflow during excavation in a fractured zone.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Groundwater inflow prediction in urban tunneling with a tunnel boring machine (TBM)
    Font-Capo, Jordi
    Vazquez-Sune, Enric
    Carrera, Jesus
    Marti, David
    Carbonell, Ramon
    Perez-Estaun, Andres
    ENGINEERING GEOLOGY, 2011, 121 (1-2) : 46 - 54
  • [2] Structural controls on groundwater inflow analysis of hardrock TBM
    Zabidi, Hareyani
    Rahim, A.
    Trisugiwo, M.
    COGENT GEOSCIENCE, 2019, 5 (01):
  • [3] TBM tunneling in marble rock masses with high in situ stress and large groundwater inflow: a case study in China
    Q. M. Gong
    L. J. Yin
    Q. R. She
    Bulletin of Engineering Geology and the Environment, 2013, 72 : 163 - 172
  • [4] TBM tunneling in marble rock masses with high in situ stress and large groundwater inflow: a case study in China
    Gong, Q. M.
    Yin, L. J.
    She, Q. R.
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2013, 72 (02) : 163 - 172
  • [5] Tunneling in limestone rock using TBM method for MRT projects near cochrane station
    Civil Engineering Department, College of Engineering, Universiti Tenaga Nasional, KM 7, Jalan Kajang-Puchong, 43009 Kajang, Selangor, Malaysia
    不详
    不详
    Electron. J. Geotech. Eng., (2535-2552):
  • [6] Fracture systems and groundwater flow in the Kobenhavn Limestone Formation
    Jakobsen, PR
    Klitten, K
    NORDIC HYDROLOGY, 1999, 30 (4-5) : 301 - 316
  • [7] TBM-Block Interaction during TBM Tunneling in Rock Masses: Block Classification and Identification
    Zhang, Z. X.
    Wang, S. F.
    Huang, X.
    Kwok, C. Y.
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2017, 17 (05)
  • [8] Analysis on the Evolution of Rock Block Behavior During TBM Tunneling Considering the TBM–Block Interaction
    Zixin Zhang
    Shuaifeng Wang
    Xin Huang
    Rock Mechanics and Rock Engineering, 2018, 51 : 2237 - 2263
  • [9] Comprehensive ahead prospecting for hard rock TBM tunneling in complex limestone geology: A case study in Jilin, China
    Liu, Bin
    Guo, Qian
    Liu, Zhengyu
    Wang, Chuanwu
    Nie, Lichao
    Xu, Xinji
    Chen, Lei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 93
  • [10] Real-Time Prediction of Operating Parameter of TBM during Tunneling
    Lee, Hang-Lo
    Song, Ki-Il
    Qi, Chongchong
    Kim, Jin-Seop
    Kim, Kyoung-Su
    APPLIED SCIENCES-BASEL, 2021, 11 (07):