Scheduling pumpoff operations in onshore oilfields with electric-power constraints and variable cycle time

被引:2
|
作者
Camponogara, Eduardo [1 ]
Guardini, Luiz Alberto [1 ]
de Assis, Leonardo Salsano [1 ]
机构
[1] Univ Fed Santa Catarina, Dept Automat & Syst Engn, CxP 476, BR-88040900 Florianopolis, SC, Brazil
关键词
Sucker-rod pumping; Scheduling; Electric-power resource; Onshore oilfield; Mixed-integer linear programming;
D O I
10.1016/j.cor.2017.09.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
An oilfield is a complex enterprise that requires hefty capital investments and substantial energy resources for its operation. In mature onshore oilfields, sucker-rod pumps are deployed to enable oil production when the reservoir pressure is low. Albeit robust, such an artificial-lifting technique relies on electric-power supply to keep the rotary machines running. Managing a limited source of electric power while, at the same time, maximizing oil production and reducing equipment wear is of paramount importance, particularly so with today's low prices for the oil barrel. To this end, this paper proposes mixed-integer linear formulations for scheduling the operations of sucker-rod pumps, which work according to a control policy that alternates between on and off pumping periods, the so called pumpoff policy. Formulations for scheduling the initial operations and reconfiguring the control policies are developed, implemented, and tested with computational experiments. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:247 / 257
页数:11
相关论文
共 50 条
  • [41] Optimal Scheduling for Electric Vehicle Charging under Variable Maximum Charging Power
    Han, Jinil
    Park, Jongyoon
    Lee, Kyungsik
    ENERGIES, 2017, 10 (07)
  • [42] OPTIMAL ELECTRIC-POWER SCHEDULING - LARGE NONLINEAR-PROGRAMMING TEST PROBLEM SOLVED BY RECURSIVE QUADRATIC PROGRAMMING
    BIGGS, MC
    LAUGHTON, MA
    MATHEMATICAL PROGRAMMING, 1977, 13 (02) : 167 - 182
  • [43] Pteri net model and its scheduling of batch process with variable cycle time
    Liao, Wei-Zhi
    Gu, Tian-Long
    Cai, Guo-Yong
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (01): : 109 - 116
  • [44] STATE ESTIMATION FOR ELECTRIC-POWER DISTRIBUTION-SYSTEMS IN QUASI REAL-TIME CONDITIONS
    ROYTELMAN, I
    SHAHIDEHPOUR, SM
    IEEE TRANSACTIONS ON POWER DELIVERY, 1993, 8 (04) : 2009 - 2015
  • [45] TIME-OF-DAY PRICING IN THE UNITED-STATES ELECTRIC-POWER INDUSTRY AT THE TURN OF THE CENTURY
    HAUSMAN, WJ
    NEUFELD, JL
    RAND JOURNAL OF ECONOMICS, 1984, 15 (01): : 116 - 126
  • [46] Scheduling of Single-Arm Cluster Tools with Residency Time Constraints and Chamber Cleaning Operations
    Li, Jie
    Qiao, Yan
    Zhang, Siwei
    Li, Zhiwu
    Wu, Naiqi
    Song, Tairan
    APPLIED SCIENCES-BASEL, 2021, 11 (19):
  • [47] SUITABILITY OF LOW-BTU GAS-COMBINED-CYCLE ELECTRIC-POWER GENERATION FOR INTERMEDIATE LOAD SERVICE
    ALICH, JA
    DICKENSON, RL
    KORENS, N
    COMBUSTION, 1975, 46 (10): : 8 - 16
  • [48] CERAMIC HEAT-EXCHANGER FOR SOLAR ELECTRIC-POWER SYSTEM USING AN OPEN-CYCLE-AIR TURBINE
    WALTON, JD
    HARRIS, JN
    AMERICAN CERAMIC SOCIETY BULLETIN, 1977, 56 (03): : 366 - 366
  • [49] Power Guarantee for Electric Systems Using Real-Time Scheduling
    Kim, Eugene
    Lee, Youngmoon
    He, Liang
    Shin, Kang G.
    Lee, Jinkyu
    IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 2020, 31 (08) : 1783 - 1798
  • [50] Scheduling of Real-Time Embedded Systems under Reliability and Power Constraints
    Assayad, Ismail
    Girault, Alain
    Kalla, Hamoudi
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON COMPLEX SYSTEMS (ICCS12), 2012, : 329 - 334