共 50 条
- [43] Pteri net model and its scheduling of batch process with variable cycle time Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (01): : 109 - 116
- [45] TIME-OF-DAY PRICING IN THE UNITED-STATES ELECTRIC-POWER INDUSTRY AT THE TURN OF THE CENTURY RAND JOURNAL OF ECONOMICS, 1984, 15 (01): : 116 - 126
- [46] Scheduling of Single-Arm Cluster Tools with Residency Time Constraints and Chamber Cleaning Operations APPLIED SCIENCES-BASEL, 2021, 11 (19):
- [47] SUITABILITY OF LOW-BTU GAS-COMBINED-CYCLE ELECTRIC-POWER GENERATION FOR INTERMEDIATE LOAD SERVICE COMBUSTION, 1975, 46 (10): : 8 - 16
- [48] CERAMIC HEAT-EXCHANGER FOR SOLAR ELECTRIC-POWER SYSTEM USING AN OPEN-CYCLE-AIR TURBINE AMERICAN CERAMIC SOCIETY BULLETIN, 1977, 56 (03): : 366 - 366
- [50] Scheduling of Real-Time Embedded Systems under Reliability and Power Constraints PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON COMPLEX SYSTEMS (ICCS12), 2012, : 329 - 334