Analysis of progressive failure of a mine slope in a Western Australian open-pit gold mine

被引:0
|
作者
Li, H [1 ]
Speight, HE [1 ]
机构
[1] CSIRO, Explorat & Min, Perth, WA 6014, Australia
关键词
gold; open-pit; mine; progressive failure; rock mass; slope stability; strength deterioration;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Development of time-dependent rock mass strength and deformation models is a strategic research direction of CSIRO Exploration gr Mining. A component of this research is the numerical modelling of mine slopes with a history of time-dependent failure. During 1990, approximately two years after excavation, a slope in the Eureka open-pit gold mine in Western Australia failed on three occasions. The failures were analysed using a finite difference code with Mohr-Coulomb and ubiquitous-joint models, and excavation of the mine was simulated in four stages. The numerical results show that the failures each started as a local yield region near the prevailing toe of the slope, and this yield region propagated upwards due to strength deterioration of the rock mass. Steeply dipping, pervasive foliation played an important role and formed approximately one third of the failure surface. The strength deterioration may have resulted from softening due to water adsorption and through local yield and propagation of defects.
引用
收藏
页码:467 / 472
页数:4
相关论文
共 50 条
  • [41] TRUCK REQUIREMENTS IN AN OPEN-PIT MINE
    MADGE, DN
    OPERATIONS RESEARCH, 1963, 11 : B123 - B123
  • [42] OPEN-PIT PLANNING AT ADAMS MINE
    WEST, FJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (647): : 329 - &
  • [43] Formation of pit lake and slope stability following mine closure: a case study of Fushun West Open-pit Mine
    Gao, Yuan
    Li, Jinduo
    Yang, Tianhong
    Meng, Lei
    Deng, Wenxue
    Zhang, Penghai
    GEOMATICS NATURAL HAZARDS & RISK, 2024, 15 (01)
  • [44] Computer-aided mine planning for an open-pit mine
    Solanki, M.K.S.
    Kanodia, H.K.
    Journal of the Institution of Engineers (India), Part MI: Mining Engineering Division, 1990, 71 (02):
  • [45] Rock Mass Quality Prediction of Open-Pit Gold Mine Slope Based on the Kriging Interpolation Method
    Tao, Zhigang
    Cui, Xuebin
    Sun, Xiaoming
    Wang, Jiong
    Liu, Kuiming
    Chen, Hong
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (06) : 5851 - 5865
  • [46] Rock Mass Quality Prediction of Open-Pit Gold Mine Slope Based on the Kriging Interpolation Method
    Zhigang Tao
    Xuebin Cui
    Xiaoming Sun
    Jiong Wang
    Kuiming Liu
    Hong Chen
    Geotechnical and Geological Engineering, 2020, 38 : 5851 - 5865
  • [47] ROSARIO-DOMINICANA OPERATES LARGEST OPEN-PIT GOLD MINE
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 1977, 178 (11): : 145 - 149
  • [48] Integration of ground-based radar and satellite InSAR data for the analysis of an unexpected slope failure in an open-pit mine
    Carla, Tommaso
    Farina, Paolo
    Intrieri, Emanuele
    Ketizmen, Hakki
    Casagli, Nicola
    ENGINEERING GEOLOGY, 2018, 235 : 39 - 52
  • [49] Evaluation of open pit mine slope stability analysis
    Verma, Dhananjai
    Thareja, Rahul
    Kainthola, Ashutosh
    Singh, T.N.
    International Journal of Earth Sciences and Engineering, 2011, 4 (04): : 590 - 600
  • [50] Stability analysis of an open pit slope in a chromite mine
    Reddy, Sandi Kumar
    Babu, A. Rajan
    PROCEEDINGS OF THE CONFERENCE ON RECENT ADVANCES IN ROCK ENGINEERING (RARE 2016), 2016, 91 : 470 - 473