Multimode resource-constrained project scheduling in flexible projects

被引:13
|
作者
Kosztyan, Zsolt T. [1 ]
Szalkai, Istvan [2 ]
机构
[1] Univ Pannonia, Fac Business & Econ, Dept Quantitat Methods, Egyet Str 10, Veszprem, Hungary
[2] Univ Pannonia, Fac Informat Technol, Dept Math, Egyet Str 10, Veszprem, Hungary
关键词
Multimode resource-constrained project scheduling problem; Flexible project management approaches; Matrix-based project planning; COST TRADEOFF PROBLEM; DISCRETE-TIME; OFF PROBLEMS; QUALITY; MODELS; AGILE;
D O I
10.1007/s10898-019-00832-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Flexible agile and extreme project management methods have become increasingly popular among practitioners, particularly in the IT and R&D sectors. In contrast to the theoretically and algorithmically well-established and developed trade-off and multimode methods applied in traditional project management methods, flexible project scheduling methods, which are applied in agile, hybrid, and especially extreme project management, lack a principled foundation and algorithmic handling. The aim of this paper is to fill this gap. We propose a matrix-based method that provides scores for alternative project plans that host flexible task dependencies and undecided, supplementary task completion while also handling the new but unplanned tasks. In addition, traditional multimode resource-constrained project scheduling problems are also covered. The proposed method can bridge the flexible and traditional approaches.
引用
收藏
页码:211 / 241
页数:31
相关论文
共 50 条
  • [21] Extending the Multimode Resource-Constrained Project Scheduling Problem by Including Value Considerations
    Balouka, Noemie
    Cohen, Izak
    Shtub, Avraham
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2016, 63 (01) : 4 - 15
  • [22] Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem
    Chu, Zihao
    Xu, Zhe
    Xie, Fang
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2019, 44 (03) : 2503 - 2517
  • [23] An Organizational Cooperative Coevolutionary Algorithm for Multimode Resource-Constrained Project Scheduling Problems
    Wang, Lixia
    Liu, Jing
    Zhou, Mingxing
    SIMULATED EVOLUTION AND LEARNING (SEAL 2014), 2014, 8886 : 680 - 690
  • [24] Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem
    Zihao Chu
    Zhe Xu
    Fang Xie
    Arabian Journal for Science and Engineering, 2019, 44 : 2503 - 2517
  • [25] Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method
    Zhang, Song
    SCIENTIFIC PROGRAMMING, 2020, 2020
  • [26] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [27] Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem
    Liu, Yongli
    Li, Renjie
    Liu, Huiran
    IEEE ACCESS, 2020, 8 : 142269 - 142281
  • [28] AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    LI, KY
    WILLIS, RJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 56 (03) : 370 - 379
  • [29] Multimode Resource-Constrained Multi-Project Scheduling with Ad Hoc Activity Splitting
    Joo, B. J.
    Chua, P. C.
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2261 - 2265
  • [30] A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources
    Delgoshaei, Aidin
    Hanjani, Sepehr Esmaeili
    Nasiri, Amir Hossein
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (03) : 195 - 212