Using fresh air in windbox repowering of existing steam power plants

被引:0
|
作者
Nayyeri, V. [1 ]
Ashary, R. Asna [1 ]
机构
[1] Univ Tabriz, Dept Mech Engn, Tabriz, Iran
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Repowering is increasing efficiency and output power of an existing steam power plants by integration them with gas turbine. Several approaches are proposed for repowering regards to condition of existing power plants. One of those approaches which provides opportunity for existing boiler reusing is windbox repowering. In this method, one or several gas turbines are installed near the existing steam unit and the exhaust of gas turbines is used as preheated combustion air for boiler. The main difficulty in integration of gas turbine and boiler is decreasing flame temperature in supplementary combustion of boiler due to low oxygen content of gas turbine exhaust compared with fresh air and its effect on heat transfer process especially in radiative sections. When advanced gas turbines are used in windbox repowering, the fresh air should be used for increasing oxygen due to low oxygen percent. In this study, the effect of using fresh air in wind box repowering will be investigated and two main arrangements, preheating and not preheating of fresh air will be compared. This study shows the advantages of using preheated air for mixing with gas turbine exhaust when advanced gas turbines are used for windbox repowering.
引用
收藏
页码:441 / 448
页数:8
相关论文
共 50 条
  • [31] Regenerative gas turbines and steam injection for repowering combined cycle power plants: Design and part-load performance
    Carapellucci, Roberto
    Giordano, Lorena
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2021, 227
  • [32] Exergy-energy analysis of full repowering of a steam power plant
    S.NIKBAKHT NASERABAD
    K.MOBINI
    A.MEHRPANAHI
    M.R.ALIGOODARZ
    [J]. Frontiers in Energy, 2015, 9 (01) : 54 - 67
  • [33] Steam Power Plants
    Hawkins, R. R.
    [J]. LIBRARY JOURNAL, 1949, 74 (20) : 1758 - 1758
  • [34] Steam Power Plants
    不详
    [J]. LIBRARY JOURNAL, 1952, 77 (14) : 1309 - 1309
  • [35] Exergy-energy analysis of full repowering of a steam power plant
    Naserabad, S. Nikbakht
    Mobini, K.
    Mehrpanahi, A.
    Aligoodarz, M. R.
    [J]. FRONTIERS IN ENERGY, 2015, 9 (01) : 54 - 67
  • [36] Effects of rotary air preheater leakage on steam power plants performance
    Farhad, S
    Younessi-Sinaki, M
    Saffar-Avval, M
    [J]. Proceedings of ECOS 2005, Vols 1-3: SHAPING OUR FUTURE ENERGY SYSTEMS, 2005, : 1255 - 1262
  • [37] Exergy-energy analysis of full repowering of a steam power plant
    S. Nikbakht Naserabad
    K. Mobini
    A. Mehrpanahi
    M. R. Aligoodarz
    [J]. Frontiers in Energy, 2015, 9 : 54 - 67
  • [38] Assessing economic feasibility of retrofitting steam dryer and steam-air preheater to existing biomass power plant
    Chantasiriwan, Somchart
    [J]. ENERGY REPORTS, 2023, 9 : 1128 - 1135
  • [39] Assessing economic feasibility of retrofitting steam dryer and steam-air preheater to existing biomass power plant
    Chantasiriwan, Somchart
    [J]. ENERGY REPORTS, 2023, 9 : 1128 - 1135
  • [40] Repowering combined cycle power plants by a modified STIG configuration
    Carapellucci, Roberto
    Milazzo, Adriano
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2007, 48 (05) : 1590 - 1600