WHY PROJECTS FAIL (AND WHAT WE CAN DO ABOUT IT)

被引:0
|
作者
Schoenhardt, Matthew B. [1 ]
Pardais, Vachel C. [1 ]
Marino, Mitch R. [1 ]
机构
[1] Stantec Consulting Ltd, Project Econ & Assessment, 10160 112 St, Edmonton, AB, Canada
关键词
risk; risk management; contingency; contingency drawdown; project controls; project management; project planning;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Over two-thirds of all mega projects result in failure, meaning they significantly exceed budget, miss schedule targets, or fail to achieve production close to design capacity. The reasons for project failure have been well documented over the past fifty years. Despite this large body of empirical evidence, many executive and project leadership teams continue to repeat the mistakes made on past projects. This can be partially attributed to project teams believing that their projects are somehow different from past projects and that others' project mistakes are not relevant to their project. This paper is a literature review that considers the seven common root causes of project failure and how these root causes relate to the pipeline industry. No new primary data will be presented. The seven common root causes for project failure and their approximate impact on budget variance are: 1. Failure to complete front end loading = 60-85% 2. escalation = Up to 12% 3. Regulatory regimes = Up to 12% 4. Plant complexity = Up to 20% 5. New technology = Up to 20% 6. Solid feedstock = Up to 10% 7. Complex ownership = Up to 24% This paper will also review and discuss seven common project traits closely associated with project failure, although not direct root causes. These traits are: 1. Concurrent detailed design and construction = up to four times greater risk profile. 2. Non-integrated project team = up to three times greater risk 3. Contractual risk misallocation = up to two and a half times greater risk 4. Fast-tracking projects = up to two times greater risk 5. Lack of internal capacity = up to two times greater risk 6. Oil and Gas industry = up to two times greater risk 7. Brownfield vs. greenfield site = no direct impact With these root causes and traits identified, several methods of risk and contingency analysis will be examined. An evaluation of each method's ability to increase the success rate of capital projects will be discussed; ultimately, resulting in a recommendation on the optimal risk and contingency framework for improving project success rates. The paper will conclude with a summary of how Stantec's risk and contingency framework is being implemented on pipeline projects.
引用
收藏
页数:13
相关论文
共 50 条