A Long-Term Evaluation on Transmission Line Expansion Planning with Multistage Stochastic Programming

被引:6
|
作者
Han, Sini [1 ]
Kim, Hyeon-Jin [1 ]
Lee, Duehee [1 ]
机构
[1] Konkuk Univ, Dept Elect Engn, Seoul 05029, South Korea
关键词
mixed-integer linear programming; transmission line expansion planning; multistage stochastic optimisation; decomposition method; DUAL DECOMPOSITION; OPTIMIZATION; MAINTENANCE; RELIABILITY; NETWORK; SOLVE; TNEP;
D O I
10.3390/en13081899
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The purpose of this paper is to apply multistage stochastic programming to the transmission line expansion planning problem, especially when uncertain demand scenarios exist. Since the problem of transmission line expansion planning requires an intensive computational load, dual decomposition is used to decompose the problem into smaller problems. Following this, progressive hedging and proximal bundle methods are used to restore the decomposed solutions to the original problems. Mixed-integer linear programming is involved in the problem to decide where new transmission lines should be constructed or reinforced. However, integer variables in multistage stochastic programming (MSSP) are intractable since integer variables are not restored. Therefore, the branch-and-bound algorithm is applied to multistage stochastic programming methods to force convergence of integer variables.In addition, this paper suggests combining progressive hedging and dual decomposition in stochastic integer programming by sharing penalty parameters. The simulation results tested on the IEEE 30-bus system verify that our combined model sped up the computation and achieved higher accuracy by achieving the minimised cost.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Static Expansion Planning of Transmission Line Using Mixed Integer Linear Programming Method
    Sainju, D.
    Sinha, R.
    Pokhrel, B. R.
    2016 IEEE 6TH INTERNATIONAL CONFERENCE ON POWER SYSTEMS (ICPS), 2016,
  • [42] Assessing policy quality in a multistage stochastic program for long-term hydrothermal scheduling
    Vitor L. de Matos
    David P. Morton
    Erlon C. Finardi
    Annals of Operations Research, 2017, 253 : 713 - 731
  • [43] Assessing policy quality in a multistage stochastic program for long-term hydrothermal scheduling
    de Matos, Vitor L.
    Morton, David P.
    Finardi, Erlon C.
    ANNALS OF OPERATIONS RESEARCH, 2017, 253 (02) : 713 - 731
  • [44] The first attempt to the modeling of long-term transmission expansion planning with consideration of HVDC point to point connections
    Niewiadomski, Waldemar
    2019 16TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2019,
  • [45] Long-term transmission expansion planning towards future European network development: analyses on HVDC corridors
    L'Abbate, A.
    Careri, F.
    Calisti, R.
    Rossix, S.
    Zani, A.
    2018 15TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2018,
  • [46] Multistage stochastic programming model for electric power capacity expansion problem
    Takayuki Shiina
    John R. Birge
    Japan Journal of Industrial and Applied Mathematics, 2003, 20 : 379 - 397
  • [47] Multistage stochastic programming model for electric power capacity expansion problem
    Shiina, T
    Birge, JR
    JAPAN JOURNAL OF INDUSTRIAL AND APPLIED MATHEMATICS, 2003, 20 (03) : 379 - 397
  • [48] Coupled Stochastic and Robust Transmission Expansion Planning
    Liu, Dundun
    Cheng, Haozhong
    Fang, Sidun
    2017 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2017,
  • [49] Differential evolution algorithm for static and multistage transmission expansion planning
    Sum-Im, T.
    Taylor, G. A.
    Irving, M. R.
    Song, Y. H.
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2009, 3 (04) : 365 - 384
  • [50] MULTISTAGE TRANSMISSION EXPANSION PLANNING USING LOCAL BRANCHING METHOD
    Asadamongkol, Somphop
    Eua-arporn, Bundhit
    ENGINEERING JOURNAL-THAILAND, 2010, 14 (04): : 23 - 40