Railway bridge monitoring during construction and sliding

被引:0
|
作者
Inaudi, D
Casanova, N
Kronenberg, P
Vurpillot, S
机构
关键词
deformation sensor; strain sensor; bridge monitoring; fiber optic sensors;
D O I
10.1117/12.274655
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Moesa railway bridge is a composite steel concrete bridge on three spans of 30 m each. The 50 cm thick concrete deck is supported on the lower flanges of two continuous, 2.7 m high I-beams. The bridge has been constructed alongside an old metallic bridge. After demolishing this one, the new bridge has been slid for 5 m by 4 hydraulic jacks and positioned on the refurbished piles of the old bridge. About 30 fiber optic, low-coherence deformation sensors were imbedded in the concrete deck to monitor its deformations during concrete setting and shrinkage, as well as during the bridge sliding phase. In the days following concrete pour it was possible to follow its thermal expansion due to the exothermic setting reaction and the following thermal and drying shrinkage. The deformations induced by the additional load produced by the successive concreting phases were also observed. During the bridge push, which extended over six hours, the embedded and surface mounted sensors allowed the monitoring of the curvature variations in the horizontal plane due to the slightly uneven progression of the jacks. Excessive curvature and the resulting cracking of concrete could be ruled out by these measurements. It was also possible to observe the bridge elongation under the heating action of the sun.
引用
收藏
页码:58 / 64
页数:7
相关论文
共 50 条
  • [31] The Field Monitoring of Buried Corrugated Steel Arch Bridge during Construction
    Wang Quanlu
    Yang Chengdong
    Zhang Mengdong
    CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT, 2010, : 296 - 300
  • [32] Stress measuring during the construction monitoring of Weisheng River Bridge in Guangzhou
    Li, Jing
    Yin, Jian-Jun
    Wang, Wei-Feng
    Jia, Xin-Lei
    Chongqing Jianzhu Daxue Xuebao/Journal of Chongqing Jianzhu University, 2006, 28 (04): : 68 - 71
  • [33] MONITORING AND ASSESSMENT OF A FRAME TUNNEL BRIDGE DURING JACKING CONSTRUCTION STAGE
    Lu, Wenliang
    Su, Dan
    Dong, Dawei
    ADVANCES IN CONCRETE STRUCTURAL DURABILITY, PROCEEDINGS OF ICDCS2008, VOLS 1 AND 2, 2008, : 1051 - 1057
  • [34] Construction of the Salzach Railway Bridge, an innovative and uniquely engineered construction in Salzburg
    Scholz, Ulrich
    Fila, Roman
    Fink, Josef
    STAHLBAU, 2007, 76 (10) : 700 - 709
  • [35] Research on Intelligent Construction Technology of Prefabricated Railway Bridge
    Qi, Chenglong
    Li, Yan
    2022 16TH IEEE INTERNATIONAL CONFERENCE ON SIGNAL PROCESSING (ICSP2022), VOL 1, 2022, : 375 - 378
  • [36] Construction of a concrete segmental arch bridge over a railway
    Prakhya, Ganga
    Hopkin, Ian
    Hansford, Bill
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2019, 172 (03) : 226 - 240
  • [37] STUDY ON CONSTRUCTION INFLUENCE OF SUBWAY ON THE BENEATH RAILWAY BRIDGE
    Yan, Xin
    Ye, Yangsheng
    Ma, Weibing
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 868 - 870
  • [38] OBB RAILWAY BRIDGE CONSTRUCTION - CHALLENGES IN USING THE EUROCODES
    Petraschek, Thomas
    ROAD AND RAIL INFRASTRUCTURE II, 2012, : 469 - 475
  • [39] Design and construction of a railway bridge in reinforced UHPFRC - World's first UHPFRC bridge on a main railway line
    Bruehwiler, Eugen
    Friedl, Herbert
    Rupp, Christoph
    Escher, Hanspeter
    BETON- UND STAHLBETONBAU, 2019, 114 (05) : 337 - 345
  • [40] MONITORING AND ANALYSIS OF SHENYANG BOGUAN BRIDGE DURING CONSTRUCTION BASED ON AN INTEGRATION HEALTH MONITORING SYSTEM
    Yi, Tinghua
    Tian, Liang
    Ren, Liang
    Li, Hongnan
    PROCEEDINGS OF THE THIRTEENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS 1 AND II, 2014, : 1788 - 1791