Flood frequency estimation by continuous simulation under climate change (with uncertainty)

被引:94
|
作者
Cameron, D [1 ]
Beven, K
Naden, P
机构
[1] Univ Lancaster, Inst Environm & Nat Sci, Lancaster LA1 4YQ, England
[2] Ctr Ecol & Hydrol, Wallingford OX10 8BB, Oxon, England
关键词
climate change; floods; frequency; TOPMODEL;
D O I
10.5194/hess-4-393-2000
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
This paper explores the potential for assessing the impacts of climate change upon flood frequency for the gauged, upland Wye catchment at Plynlimon, Wales, UK, while taking account of uncertainty in modelling rainfall-runoff processes under current conditions. A continuous simulation methodology which uses a stochastic rainfall model to drive the rainfall-runoff model TOPMODEL is utilised. Behavioural parameter sets for both the rainfall model and TOPRMODEL are identified prior to the climate change runs using the Generalised Likelihood Uncertainty Estimation (GLUE) methodology. The "medium-high" UKCIP98 climate change scenario, obtained from the HadCM2. GCM simulations, is used as a starting point for a variety of different scenarios at the catchment scale. It is demonstrated that while the scenarios have only a small impact upon the likelihood weighted flood frequency uncertainty bounds in comparison with the current condition scenario, the risk of a given discharge as an element in the distribution of T year floods is changed. This underlines the need to account explicitly for uncertainty within hydrological modelling, especially in estimating the impacts of climate change.
引用
收藏
页码:393 / 405
页数:13
相关论文
共 50 条
  • [1] Flood frequency estimation by continuous simulation (with likelihood based uncertainty estimation)
    Cameron, D
    Beven, K
    Tawn, J
    Naden, P
    [J]. HYDROLOGY AND EARTH SYSTEM SCIENCES, 2000, 4 (01) : 23 - 34
  • [2] Flood frequency estimation by continuous simulation for a catchment treated as ungauged (with uncertainty)
    Blazkova, S
    Beven, K
    [J]. WATER RESOURCES RESEARCH, 2002, 38 (08)
  • [3] Flood frequency estimation by continuous simulation for a gauged upland catchment (with uncertainty)
    Cameron, DS
    Beven, KJ
    Tawn, J
    Blazkova, S
    Naden, P
    [J]. JOURNAL OF HYDROLOGY, 1999, 219 (3-4) : 169 - 187
  • [4] An application of the UKCIP02 climate change scenarios to flood estimation by continuous simulation for a gauged catchment in the northeast of Scotland, UK (with uncertainty)
    Cameron, David
    [J]. JOURNAL OF HYDROLOGY, 2006, 328 (1-2) : 212 - 226
  • [5] INVESTMENT IN FLOOD PROTECTION MEASURES UNDER CLIMATE CHANGE UNCERTAINTY
    de Bruin, Karianne
    Ansink, Erik
    [J]. CLIMATE CHANGE ECONOMICS, 2011, 2 (04) : 321 - 339
  • [6] Comparison of uncertainty sources for climate change impacts: flood frequency in England
    Kay, A. L.
    Davies, H. N.
    Bell, V. A.
    Jones, R. G.
    [J]. CLIMATIC CHANGE, 2009, 92 (1-2) : 41 - 63
  • [7] Comparison of uncertainty sources for climate change impacts: flood frequency in England
    A. L. Kay
    H. N. Davies
    V. A. Bell
    R. G. Jones
    [J]. Climatic Change, 2009, 92 : 41 - 63
  • [8] Uncertainty in the estimation of potential evapotranspiration under climate change
    Kingston, Daniel G.
    Todd, Martin C.
    Taylor, Richard G.
    Thompson, Julian R.
    Arnell, Nigel W.
    [J]. GEOPHYSICAL RESEARCH LETTERS, 2009, 36
  • [9] Climate Change and Multi-Reservoirs Impacts on Extreme Flood: Nonstationary Regional Frequency Analysis and Uncertainty Estimation
    Du, Hong
    Xia, Jun
    Zeng, Sidong
    Tu, Yike
    [J]. WATER RESOURCES MANAGEMENT, 2024, 38 (03) : 951 - 965
  • [10] Climate Change and Multi-Reservoirs Impacts on Extreme Flood: Nonstationary Regional Frequency Analysis and Uncertainty Estimation
    Hong Du
    Jun Xia
    Sidong Zeng
    Yike Tu
    [J]. Water Resources Management, 2024, 38 : 951 - 965