Ex-post evaluation of Interruptible Load programs with a system optimisation perspective

被引:5
|
作者
Ribo-Perez, D. [1 ]
Carrion, A. [2 ]
Rodriguez Garcia, J. [1 ]
Alvarez Bel, C. [1 ]
机构
[1] Univ Politecn Valencia, IIE, Camino Vera S-N, Valencia 46022, Spain
[2] Univ Politecn Valencia, I3M, Camino Vera S-N, Valencia 46022, Spain
关键词
Interruptible Load; Ex-post evaluation; Spain; MILP optimisation; RESIDENTIAL DEMAND RESPONSE; ELECTRICITY MARKETS; FLEXIBILITY; BENEFITS; POWER; PARTICIPATION; ALGORITHMS; CHALLENGES; MANAGEMENT; OPERATION;
D O I
10.1016/j.apenergy.2021.117643
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The deployment of demand response in reserve markets has been widely discussed. Interruptible Load programs contract demand capacity from consumers in exchange for fixed and variable payments. System operators contract these resources to increase system resilience and use them for economic purposes. Although common, no ex-post evaluations of the program's performance and efficiency exists in the literature. To fill this gap, the paper presents a procedure to evaluate the optimal usage of these resources from a system operator perspective. A Mixed Integer Linear Problem is set to minimise the overall cost of the system using the participant demand resources in the tertiary reserve market, while ensuring that all technical and regulatory constraints are fulfilled in the evaluation. The proposed method describes a series of metrics to compare the optimal performance with the current scenario, and we draw a set of conclusions and policy recommendations from it. We apply the method to the Spanish Interruptible Load program. Our results show that during the five and a half years of the program, demand resources could have provided savings to the system of up to 23% of the cost of tertiary reserve.
引用
下载
收藏
页数:16
相关论文
共 50 条
  • [31] AN EX-POST EVALUATION OF CANADIAN OCCUPATIONAL PROJECTIONS, 1961-1981
    FOOT, DK
    MELTZ, NM
    RELATIONS INDUSTRIELLES-INDUSTRIAL RELATIONS, 1992, 47 (02): : 268 - 278
  • [32] Survey data for ex-post evaluation of the horticulture project in the Marshall Islands
    Cheng, Yan-Tzong
    Tseng, Yun-Ching
    Tseng, Ching-Wan
    DATA IN BRIEF, 2021, 36
  • [33] Ex-post evaluation in the European Parliament: an increasing influence on the policy cycle
    Anglmayer, Irmgard
    Scherrer, Amandine
    JOURNAL OF LEGISLATIVE STUDIES, 2020, 26 (03): : 405 - 426
  • [34] EX-POST EVALUATION OF 5 YEARS OF INTERNATIONAL TRAINING IN AGRICULTURAL EXTENSION
    SANTUCCI, FM
    SERGI, P
    AGRICULTURAL ADMINISTRATION, 1984, 15 (02): : 115 - 127
  • [35] Ex-post evaluation of clean production agreements in the Chilean industrial sectors
    Mardones, Cristian
    Bienzobas, Rocio
    JOURNAL OF CLEANER PRODUCTION, 2019, 213 : 808 - 818
  • [36] Ex-post evaluation of residential insulation program in the city of Temuco, Chile
    Mardones, Cristian
    ENERGY FOR SUSTAINABLE DEVELOPMENT, 2021, 62 : 126 - 135
  • [37] Ex-post evaluation of preparedness education in disaster prevention, mitigation and response
    Chou, Jui-Sheng
    Yang, Kuo-Hsin
    Ren, Ting-Cheng
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2015, 12 : 188 - 201
  • [38] Ex-Ante and Ex-Post Feature Evaluation of Online Courses Using the Kano Model
    Marutschke, Daniel Moritz
    Hayashi, Yugo
    INTELLIGENT TUTORING SYSTEMS (ITS 2021), 2021, 12677 : 310 - 320
  • [39] TransMilenio BRT system in Bogota, high performance and positive impact - Main results of an ex-post evaluation
    Hidalgo, Dario
    Pereira, Liliana
    Estupinan, Nicolas
    Luis Jimenez, Pedro
    RESEARCH IN TRANSPORTATION ECONOMICS, 2013, 39 (01) : 133 - 138
  • [40] Ex-post evaluation analysis of flood control engineering system based on grey relation projection method
    Xiao, Yi
    Shao, Dongguo
    Wu, Yunqing
    PROCEEDINGS OF 2007 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES, VOLS 1 AND 2, 2007, : 221 - 225