Ex-post evaluation of Interruptible Load programs with a system optimisation perspective

被引:5
|
作者
Ribo-Perez, D. [1 ]
Carrion, A. [2 ]
Rodriguez Garcia, J. [1 ]
Alvarez Bel, C. [1 ]
机构
[1] Univ Politecn Valencia, IIE, Camino Vera S-N, Valencia 46022, Spain
[2] Univ Politecn Valencia, I3M, Camino Vera S-N, Valencia 46022, Spain
关键词
Interruptible Load; Ex-post evaluation; Spain; MILP optimisation; RESIDENTIAL DEMAND RESPONSE; ELECTRICITY MARKETS; FLEXIBILITY; BENEFITS; POWER; PARTICIPATION; ALGORITHMS; CHALLENGES; MANAGEMENT; OPERATION;
D O I
10.1016/j.apenergy.2021.117643
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The deployment of demand response in reserve markets has been widely discussed. Interruptible Load programs contract demand capacity from consumers in exchange for fixed and variable payments. System operators contract these resources to increase system resilience and use them for economic purposes. Although common, no ex-post evaluations of the program's performance and efficiency exists in the literature. To fill this gap, the paper presents a procedure to evaluate the optimal usage of these resources from a system operator perspective. A Mixed Integer Linear Problem is set to minimise the overall cost of the system using the participant demand resources in the tertiary reserve market, while ensuring that all technical and regulatory constraints are fulfilled in the evaluation. The proposed method describes a series of metrics to compare the optimal performance with the current scenario, and we draw a set of conclusions and policy recommendations from it. We apply the method to the Spanish Interruptible Load program. Our results show that during the five and a half years of the program, demand resources could have provided savings to the system of up to 23% of the cost of tertiary reserve.
引用
下载
收藏
页数:16
相关论文
共 50 条
  • [1] Ex-post evaluation of regional bureaucracy development programs
    Borshchevskiy, Georgiy A.
    VOPROSY EKONOMIKI, 2018, (01): : 45 - 70
  • [2] Rural development programs' impact on environment: An ex-post evaluation of organic faming
    Cisilino, Federica
    Bodini, Antonella
    Zanoli, Agostina
    LAND USE POLICY, 2019, 85 : 454 - 462
  • [3] AN EX-ANTE PERSPECTIVE ON DEREGULATION, VIEWED EX-POST
    KAPLOW, L
    RESOURCE AND ENERGY ECONOMICS, 1993, 15 (02) : 153 - 173
  • [4] An Ex-Post Evaluation of Agricultural Extension Programs for Reducing Fertilizer Input in Shaanxi, China
    Hua, Chunlin
    Woodward, Richard T.
    You, Liangzhi
    SUSTAINABILITY, 2017, 9 (04):
  • [5] Social Impact Ex-Post Evaluation Protocol
    Gomez, Aitor
    de Leon, Manuel
    Sanchez-Plaza, Anabel
    Soler-Gallart, Marta
    INTERNATIONAL JOURNAL OF QUALITATIVE METHODS, 2022, 21
  • [6] Ex-post Evaluation of Mergers in the Supermarket Industry
    Pires, Tiago
    Trindade, Andre
    REVIEW OF INDUSTRIAL ORGANIZATION, 2018, 52 (03) : 473 - 496
  • [7] Ex-post evaluation of European energy models
    Pilavachi, P. A.
    Dalamaga, Th.
    di Valdalbero, D. Rossetti
    Guilmot, J. -F.
    ENERGY POLICY, 2008, 36 (05) : 1726 - 1735
  • [8] EX-POST EFFICIENCY AND MUTUAL FUND EVALUATION
    JENNERGREN, LP
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1992, 20 (02): : 249 - 255
  • [9] Ex-post Evaluation of Mergers in the Supermarket Industry
    Tiago Pires
    André Trindade
    Review of Industrial Organization, 2018, 52 : 473 - 496
  • [10] Empirical Research on the Science and Technology Project Ex-post Evaluation Index System
    Jia Wang
    Cao, Daiyong
    ADVANCES IN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-4, 2013, 712-715 : 3144 - 3148