New algorithm of mine slope reliability based on limiting state hyper-plane and its engineering application

被引:6
|
作者
Liu Zhi-xiang [1 ]
Tang Zhi-xiang [1 ]
Wang Wei-hua [1 ]
Sun Jing-jing [1 ]
Peng Kang [1 ]
机构
[1] Cent S Univ, Sch Resources & Safety Engn, Changsha 410083, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
limiting state hyper-plane; mine slope; reliability; engineering application;
D O I
10.1007/s11771-015-2524-8
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Due to the influence of joint fissure, mining intensity, designed slope angle, underground water and rainfall, the failure process of mine slope project is extremely complicated. The current safety factor calculation method has certain limitations, and it would be difficult to obtain the reliability index when the performance function of reliability analysis is implicit or has high order terms. Therefore, with the help of the logistic equation of chaos theory, a new algorithm of mine slope reliability based on limiting state hyper-plane is proposed. It is shown that by using this new reliability algorithm the calculation of partial derivative of performance function is avoided, and it has the advantages of being simple and easy to program. The new algorithm is suitable for calculating the reliability index of complex performance function containing high order terms. Furthermore, the limiting state hyper-plane models of both simplified Bishop's and Janbu's method adaptive to slope project are obtained, and have achieved satisfactory effect in the study of mine slope stability in Dexing copper open pit.
引用
收藏
页码:317 / 322
页数:6
相关论文
共 50 条
  • [21] Engineering Structural Reliability Calculation Based on Algorithm of Most Optimization Calculation and Its Realization with Lingo
    Li, Li
    Jiang, Hongyi
    Zheng, Yi
    Xu, Jialong
    Sun, Meizhu
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 3089 - 3093
  • [22] Development of web-based reliability data analysis algorithm model and its application
    Hwang, Seok-Won
    Oh, Ji-Yong
    Moosung Jae
    ANNALS OF NUCLEAR ENERGY, 2010, 37 (02) : 248 - 255
  • [23] A new QPSO based hybrid algorithm for bound-constrained optimisation problem and its application in engineering design problems
    Kumar, Nirmal
    Rahman, Md Sadikur
    Duary, Avijit
    Mahato, Sanat Kumar
    Bhunia, Asoke Kumar
    INTERNATIONAL JOURNAL OF COMPUTING SCIENCE AND MATHEMATICS, 2020, 12 (04) : 385 - 412
  • [24] A new three-phase algorithm for computation of reliability index and its application in structural mechanics
    Roudak, Mohammad Amin
    Shayanfar, Mohsen Ali
    Barkhordari, Mohammad Ali
    Karamloo, Mohammad
    MECHANICS RESEARCH COMMUNICATIONS, 2017, 85 : 53 - 60
  • [25] Reliability Analysis Method Based on Optimization Neural Network- Uniform Experimental And Its Application In For Slope Stability
    Gao, Jianglin
    Yang, Zhigang
    Wan, Xiaoqing
    2012 WORLD AUTOMATION CONGRESS (WAC), 2012,
  • [26] A Geometry-Based Accelerated Fusion Clustering Algorithm and its Application in Marine Engineering
    Wang Tianzhen
    Liu Yang
    Tang Tianhao
    PROGRESS IN MEASUREMENT AND TESTING, PTS 1 AND 2, 2010, 108-111 : 106 - 111
  • [27] Percentile-Based Adaptive Immune Plasma Algorithm and Its Application to Engineering Optimization
    Aslan, Selcuk
    Demirci, Sercan
    Oktay, Tugrul
    Yesilbas, Erdal
    BIOMIMETICS, 2023, 8 (06)
  • [28] Improved complex method based on particle swarm optimization algorithm and its application to slope stability analysis
    Li Liang
    Chi Shi-chun
    Lin Gao
    ROCK AND SOIL MECHANICS, 2005, 26 (09) : 1393 - 1398
  • [29] Improved complex method based on particle swarm optimization algorithm and its application to slope stability analysis
    Li, Liang
    Chi, Shi-Chun
    Lin, Gao
    Yantu Lixue/Rock and Soil Mechanics, 2005, 26 (09): : 1393 - 1398
  • [30] A predictive control algorithm of integral processes based on state correction and its application
    Qi L.
    Li L.
    Luan Z.
    Lü W.
    Huang D.
    Huagong Xuebao/CIESC Journal, 2016, 67 (03): : 685 - 689