共 50 条
- [42] Study on Application of CSG Cofferdam in Hydropower Station Construction 2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 44 - 47
- [43] BIM Application and practice with Rhino -A Case Study of Steel Construction in Datong Library ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2052 - 2056
- [44] Analysis of the Influence of Subway Construction on Urban Development: A Case Study of Changzhou CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 2882 - 2890
- [45] Experimental study on punching shear failure of flat slab structure with steel column and steel capital in RC slab Journal of Structural and Construction Engineering, 2020, 85 (768): : 299 - 309
- [46] Study on seismic performance of beam-column-slab interior joints in cross section of assembled monolithic subway station Jianzhu Jiegou Xuebao/Journal of Building Structures, 2019, 40 (08): : 51 - 60
- [47] Study on seismic performance of beam-column-slab interior joints in longitudinal section of assembled monolithic subway station Jianzhu Jiegou Xuebao/Journal of Building Structures, 2019, 40 (09): : 95 - 103
- [48] Standardization Study of Assembly Floor Slab in Steel Frame Structure Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 244 - 249
- [50] A Case Study on Stratified Settlement and Rebound Characteristics due to Dewatering in Shanghai Subway Station SCIENTIFIC WORLD JOURNAL, 2013,